Toronto District School Board
Skip to main content

Palmerston Avenue Junior Public School (GR. JK-06)

Health and Safety (H&S) workplace inspections are conducted every month in all of our 582 operating schools. Below you can find the H&S reports for your school, for the 2019-2020 and 2020-2021 school years.  More information and Frequently Asked Questions

Date InspectedLocation in SchoolHealth & Safety Issue ObservedClassAction Taken ByDate Action TakenDetails
10/15/1924 south. trip hazard (i.e. flooring, other materials)APrincipal11/06/19Details
10/15/1924 northfire exit route sign (yellow TDSB) - not posted / requires updatingBPrincipal10/22/19Details
11/13/1927 annexdamaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)ACaretaker12/11/19Details
11/13/19Annex Boiler Roomdamaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)ACaretaker12/09/19Details
11/13/1925A & 26 unable to inspect (specify why if possible)BCaretaker12/09/19Details
11/13/19corridor 2nd floor annex ceiling damaged (specify)ACaretaker12/09/19Details
11/13/19boiler room main buildingdamaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)ACaretaker12/09/19Details
12/13/1923ceiling tiles missingACaretaker12/16/19Details
12/13/19boiler roomdamaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)ACaretaker12/16/19Details
12/13/19Boiler Room.paint flaking, chipping, possible lead exposureACaretaker12/16/19Details
12/13/19Hallceiling tiles missingACaretaker12/16/19Details
01/03/20boiler room main buildingceiling damaged (specify)ACaretaker03/09/20Details
01/03/204Ainappropriate storage of materials/furniture/shelving, or clutterBCaretaker03/09/20Details
01/31/2019extension cord/power bar - inappropriate use of extension cord/power bar (be specific)BPrincipal05/01/20Details
01/31/20Annex Boiler RoomACM - yellow asbestos bags present (incl. number of bags)A1Caretaker06/26/20Details
01/31/2019equipment damaged or not securedBPrincipal05/01/20Details
01/31/20Annex Boiler Roomeyewash station required or in need of repair (specify)ACaretaker06/26/20Details
01/31/2019display(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls)BPrincipal05/01/20Details
01/31/20school wide display(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls)BPrincipal05/01/20Details
01/31/2017display(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls)BPrincipal05/01/20Details
01/31/2018extension cord/power bar - inappropriate use of extension cord/power bar (be specific)BPrincipal05/01/20Details
03/06/2018trip hazard (i.e. flooring, other materials)ACaretaker03/09/20Details
03/06/2018door/access door (specify)ACaretaker03/09/20Details
06/02/20Exit 3 foyer ceiling damaged (specify)ACaretaker06/26/20Details
06/02/20Boiler Room.ceiling damaged (specify)ACaretaker06/26/20Details
06/02/20Pump Roomleaking/pooling/ponding of water or liquid (be as specific as possible)ACaretaker06/26/20Details
06/02/201st floor hallceiling tiles missingACaretaker06/26/20Details
07/13/20roof annexegress blocked or insufficient path (doorway, hallway or stairwell)BCaretaker09/21/20Details
07/13/20Annex Boiler Roomeyewash station required or in need of repair (specify)ACaretaker09/21/20Details
09/15/2030paint flaking, chipping, possible lead exposureAPrincipal02/01/21Details
09/15/20Exit 5 Stairslighting in need of repair (maintenance issue)ACaretaker09/21/20Details
11/20/20electrical rm main building leaking/pooling of liquid/water on equipment (be as specific as possible)APrincipal11/23/20Details
11/20/2027 annexdamaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)ACaretaker12/08/20Details
11/20/2025A & 26 unable to inspect (specify why if possible)BPrincipal11/23/20Details
11/27/205microwave stickers missingBPrincipal11/30/20Details
11/27/205display(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls)BPrincipal01/13/21Details
11/27/206fire exit route sign (yellow TDSB) - not posted / requires updatingBPrincipal11/30/20Details
11/27/204ACM - tiles broken/damaged, possible ACMAPrincipal11/30/20Details
11/27/20Photocopy Rm (Main Office area)microwave stickers missingBPrincipal11/30/20Details
11/27/205extension cord/power bar - inappropriate use of extension cord/power bar (be specific)BCaretaker12/08/20Details
11/27/204extension cord/power bar - inappropriate use of extension cord/power bar (be specific)BCaretaker12/08/20Details
01/19/211st floor hallHealth & Safety bulletin board - required items are missing or outdated (be specific)BCaretaker02/02/21Details
01/19/211 HSP fire exit route sign (yellow TDSB) - not posted / requires updatingBCaretaker02/02/21Details
01/19/2112extension cord/power bar - inappropriate use of extension cord/power bar (be specific)BCaretaker02/02/21Details
02/21/2121ceiling damaged (specify)APrincipal03/23/21Details
04/01/21electrical rm main building unable to inspect (specify why if possible)BCaretaker04/08/21Details
04/01/21stages stairsdamaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs)ACaretaker04/08/21Details
04/01/217furniture unsafe - requires repairACaretaker04/08/21Details
04/30/21Boiler Room.ceiling damaged (specify)APrincipal06/30/21Details
04/30/215extension cord/power bar - inappropriate use of extension cord/power bar (be specific)BPrincipal05/27/21Details
04/30/21Boiler Room.panel (specify) APrincipal06/30/21Details
04/30/21Boiler Room.panel (specify) APrincipal06/30/21Details
04/30/21Boiler Room.ACM - yellow asbestos bags present (incl. number of bags)A1Principal06/30/21Details
04/30/213window covering recommended on 1st floor (emergency lockdown procedures)BPrincipal05/27/21Details
04/30/213window covering recommended on 1st floor (emergency lockdown procedures)BPrincipal05/27/21Details
04/30/214window covering recommended on 1st floor (emergency lockdown procedures)BPrincipal05/27/21Details
04/30/216window covering recommended on 1st floor (emergency lockdown procedures)BPrincipal05/27/21Details
04/30/215window covering recommended on 1st floor (emergency lockdown procedures)BPrincipal05/27/21Details
06/14/21Photocopy Rm (Main Office area)Joint Health & Safety Committee meeting minutes - latest copy not postedBPrincipal06/30/21Details
06/14/21boiler room main buildingfire exit route sign (yellow TDSB) - not posted / requires updatingBPrincipal06/30/21Details
06/14/2111fire exit route sign (yellow TDSB) - not posted / requires updatingBPrincipal06/30/21Details
06/14/2110fire exit route sign (yellow TDSB) - not posted / requires updatingBPrincipal06/30/21Details
06/14/21Photocopy Rm (Main Office area)Workplace Inspection Report posted?BPrincipal06/30/21Details
© 2014 Toronto District School Board  |  Terms of Use  |  Privacy   |  CASL