Toronto District School Board
Skip to main content

Humbercrest Public School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
50.35 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Elevators and Lifts - Stair Lift RenewalUrgent
Floor Finishes - Carpet Remaining Areas RenewalUrgent
Heating Water Distribution Systems - Heating Piping RenewalUrgent
Air Handling Units - SF #1 RenewalHigh
B201020 Exterior Walls - Ceramic Tile RenewalHigh
B203004 Exterior Doors - Overhead and Roll - up RenewalHigh
B203009 Exterior Doors - Barrier Free Hardware RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Acoustic ceiling tiles in classrooms and gymnasium RenewalHigh
Distribution Systems - Air Distribution, Heating & Cooling - Duct System RenewalHigh
Distribution Systems - Exhaust Systems - Axial RenewalHigh
Distribution Systems - Exhaust Systems - Centrifugal RenewalHigh
Domestic Water Distribution - DH Water Storage Tank RenewalHigh
Domestic Water Distribution - Pipes and Fittings - Original RenewalHigh
Domestic Water Distribution - Sump Pumps RenewalHigh
Electrical Service and Distribution - Panelboards RenewalHigh
Exterior Doors - Glazed entrance doors RenewalHigh
Exterior Doors - Painted hollow metal doors RenewalHigh
Fencing & Gates - Exterior stairs and ramp RenewalHigh
Fencing & Gates - Wrought Iron Fence RenewalHigh
Fin Tube Radiation Units - Original Perimeter Heating RenewalHigh
Interior Stair Construction RenewalHigh
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalHigh
Lighting and Branch Wiring - Stage Lighting RenewalHigh
Roof Top AHU - Heat - RTU #2 RenewalHigh
Sanitary Waste - Piping RenewalHigh
Standard Foundations - Localized Deficiencies RenewalHigh
Wall Finishes - Ceramic Tile - Boys & Girls Washrooms RenewalHigh
B1030 Structural Columns and Beams - Locally Deteriorated RenewalMedium
C101003 Partitions - Moveable - Foldable Partition (Classroom) RenewalMedium
C103009 Fittings - Millwork - Laboratories RenewalMedium
Ceiling Finishes - Hallway suspended acoustic ceiling tiles RenewalMedium
Exterior Doors - Hardware - Glazed Entrance RenewalMedium
Exterior Doors - Hardware - Painted Hallow Metal Door RenewalMedium
Fittings - Lockers RenewalMedium
Fittings - Millwork - 1915, 1928, 1932 & 1964 Construction RenewalMedium
Floor Finishes - Hardwood floors RenewalMedium
Floor Finishes - Terrazzo - Deficiency RenewalMedium
Interior Doors - Hardware RenewalMedium
Interior Doors RenewalMedium
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density RenewalMedium
Partitions - Localized Deficiencies RenewalMedium
Roof Coverings - Section E4 RenewalMedium
Stormwater Management RenewalMedium
Wall Finishes - Painted RenewalMedium
Ceiling Finishes - Library suspended acoustic ceiling tiles RenewalLow
Cooling Generating Systems - DX Split - Office RenewalLow
Fittings - Drapes and blinds RenewalLow
Fittings - Retractable basketball hoops RenewalLow
Parking Lots - Side lot and under building parking RenewalLow
Pedestrian Paving - East and south side walkway areas RenewalLow
Playing Fields - Asphalt paved track RenewalLow
Playing Fields - Henderson Playscape - Unpaved RenewalLow
Playing Fields - North elevation asphalt paved playground RenewalLow
Playing Fields - Old Site - Unpaved RenewalLow