Brief Description | Priority |
Auxiliary Equipment - Expansion Tanks - Upper Fan Room Renewal | Urgent |
Electrical Service and Distribution - Motor Control Centres Renewal | Urgent |
Secondary Transformers Renewal | Urgent |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
B2030 Exterior Doors - Hollow Metal Renewal | High |
B203004 Exterior Doors - Overhead and Roll - up Renewal | High |
B203008 Exterior Doors - Hardware Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103017 Fittings - Auditorium Seating Renewal | High |
C301007 Wall Finishes - Acoustic Panel - Older Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Acoustic Panels Renewal | High |
Ceiling Finishes - Suspended Ceiling Tiles Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - DX Splits Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Distribution Systems - Exhaust Systems - Fume Hood Renewal | High |
Electrical Service and Distribution - Panelboards Renewal | High |
Elevators and Lifts - Dumbwaiter Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Windows - Single Glazed Windows Renewal | High |
Fencing & Gates - Fence Renewal | High |
Fencing & Gates - Original Building Renewal | High |
Fin Tube Radiation Units - Perimeter Heating - Level 1 Renewal | High |
Fin Tube Radiation Units - Perimeter Heating - Level 2 Renewal | High |
Fin Tube Radiation Units - Perimeter Heating - Level 3 Renewal | High |
Fittings - Lockers Renewal | High |
Fittings - Millwork - Science Laboratory Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Hardwood Floor Renewal | High |
Floor Finishes - Sheet Vinyl Floor Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Heated Water Distribution Systems - Pipes and Fittings - Level 1 Renewal | High |
Heated Water Distribution Systems - Pipes and Fittings - Level 2 Renewal | High |
Heated Water Distribution Systems - Pipes and Fittings - Level 3 Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
Lighting and Branch Wiring - Stage Lighting Renewal | High |
Other HVAC Systems and Equipment - Refrigeration Systems - Freezer Renewal | High |
Other HVAC Systems and Equipment - Refrigeration Systems - Walk in Coolers Renewal | High |
Pedestrian Paving - Asphalt & Concrete Renewal | High |
Plumbing Fixtures - Washroom Renewal | High |
Retaining Walls - Concrete Renewal | High |
Roadways - Asphalt Renewal | High |
Sanitary Waste Renewal | High |
Wall Finishes - Painted Renewal | High |
B308020 Exterior Soffits Renewal | Medium |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Domestic Water Distribution - Pipes and Fittings Renewal | Medium |
Exterior Windows - Single and Double Glazed Windows Renewal | Medium |
Floor Finishes - Ceramic Renewal | Medium |
Floor Finishes - Terrazzo Renewal | Medium |
Interior Doors - Corridor Metal Doors Renewal | Medium |
Interior Doors - Hardware - 1963 Renewal | Medium |
Interior Doors - Wood Doors Renewal | Medium |
Landscaping - Sod Renewal | Medium |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Medium Density Renewal | Medium |
Sanitary Waste - Sewage Ejector Pump Renewal | Medium |
Site Civil/Mechanical Utilities Renewal | Medium |
Exterior Doors - Exit 4 Automatic Door Device Renewal | Low |
Playing Fields - Sod - Unpaved Renewal | Low |
Playing Fields - Track - Unpaved Renewal | Low |
Signage - All Renewal | Low |
Stormwater Management Renewal | Low |
Wall Finishes - Painted - Gym Change Room & Stairwell Renewal | Low |