Brief Description | Priority |
Auxiliary Equipment - Cushion, Condensate, Vacuum Return, Blowdown and Condensate Return Tanks Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Heat Exchangers - Shell & Tube Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | Urgent |
Exterior Windows - Original Older Renewal | Urgent |
Floor Expansion Joints - Garage Renewal | Urgent |
Gas Supply System - Piping Renewal | Urgent |
Hot Water Boiler - Boiler #3 Renewal | Urgent |
Site Civil/Mechanical Utilities Renewal | Urgent |
Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
Steam Boilers - Boiler #1 & #2 Renewal | Urgent |
Structural Frame - Concrete Canopy Soffit Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Units - SF #1 and SF #2 Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
C1010 Partitions - Localized deficiencies Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103009 Fittings - Millwork - Laboratories Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Acoustic Tile Ceiling - 1959 Building (Public School) Renewal | High |
Controls and Instrumentation - BAS Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Domestic Water Distribution - DHWH #1 Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Hot Water Storage Tank Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Exhaust Systems Renewal | High |
Exterior Walls - Joint Sealant Renewal | High |
Exterior Walls - Masonry Re-pointing Renewal | High |
Fencing & Gates - Chain Link Fence Renewal | High |
Fencing and Gates - Wrought Iron Fencing Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Lockers - 1959 Building (Public School) Renewal | High |
Fittings - Millwork - 1959 Building (Public School) Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Rain Water Drainage - Sump Pumps Renewal | High |
Retaining Walls - Stone Renewal | High |
Roof Coverings - Section B2 Renewal | High |
Sanitary Waste - Piping Renewal | High |
Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Slab on Grade - Aged Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painted - 1959 Building (Public School) Renewal | High |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Domestic Water Distribution - Eyewash Stations Renewal | Medium |
Exterior Doors - Newer Renewal | Medium |
Exterior Doors - Overhead and Roll - up Renewal | Medium |
Floor Finishes - Carpet - Library & Offices Renewal | Medium |
Interior Doors - Hardware - 1959 Building (Public School) Renewal | Medium |
Interior Doors - Main Building Renewal | Medium |
Playing Fields - Asphalt Paved Playground - Site Renewal | Medium |
Signage - Upgrades Renewal | Medium |
Standard Foundations - North Wall Damp Proofing Renewal | Medium |
Stormwater Management Renewal | Medium |
Exterior Doors - Hardware - Newer Renewal | Low |