Perth Avenue Junior Public School

Facility Condition Index

2024 -2025

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
48.54 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 25,600 different repairs needed in our schools. The total value of those repairs was $4.45 billion as of January 2025.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Standard Foundations Repairs - Parging repairs RenewalUrgent
Branch Wiring RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C302001 Floor Finishes - Ceramic RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Distribution Systems - Air Distribution, Heating & Cooling - Duct System RenewalHigh
Distribution Systems - Exhaust Systems - Centrifugal RenewalHigh
Distribution Systems - Heated Water Distribution Systems - Piping System RenewalHigh
Domestic Water Distribution - Natural Gas DWH #2 and #3 RenewalHigh
Domestic Water Distribution - Pipes and Fittings RenewalHigh
Electrical Service and Distribution - Secondary Transformers RenewalHigh
Exterior Doors - Hardware RenewalHigh
Exterior Doors - Metal Doors - Original Building & Addition 1 RenewalHigh
Exterior Walls - Joint Sealant RenewalHigh
Exterior Walls - Masonry Re-pointing RenewalHigh
Fencing & Gates - Chain Link & Wrought Iron RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Draps RenewalHigh
Fittings - Millwork - Original Building & Addition 1 RenewalHigh
Floor Finishes - Sheet Vinyl Floor - Original Building & Addition 1 RenewalHigh
Interior Doors - Hardware - Original Building & Addition 1 RenewalHigh
Interior Doors - Wood & Metal - Original Building & Addition 1 RenewalHigh
Lighting Equipment - Interior RenewalHigh
Main Switchboards - Secondary Switchgear RenewalHigh
Pedestrian Paving - Asphalt RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Sanitary Waste - Piping RenewalHigh
Signage - Lettering RenewalHigh
Site Civil/Mechanical Utilities - Site RenewalHigh
Wall Finishes - Painted - All Areas RenewalHigh
Ceiling Finishes - Suspended Acoustic Panel Ceiling - Original Building & Addition 1 RenewalMedium
Domestic Water Distribution - Natural Gas DWH #1 RenewalMedium
Interior Stair Construction - Approx 4 Stairs RenewalMedium
Playing Fields - Elementrary Playscape - Unpaved RenewalMedium
Site Development - Site Related Stair - Site RenewalMedium
Stormwater Management RenewalMedium
Domestic Water Distribution - Drinking Fountains and Coolers RenewalLow
Landscaping - Front RenewalLow
Playing Fields - Unpaved RenewalLow

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.