The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
95.83 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Condensate Return Tanks, Vacuum Return Tank and Blowdown Tank RenewalUrgent
Auxiliary Equipment - HVAC Pumps RenewalUrgent
Auxiliary Equipment - Stacks & Breaching RenewalUrgent
Electrical Service and Distribution - Panelboards RenewalUrgent
Interior Stair Construction - Steelframed with Cement Tread RenewalUrgent
Roof Coverings - Section A,A1,B,B1,F1 to F3 RenewalUrgent
Roof Coverings - Section E to E4,ED1 RenewalUrgent
Roof Coverings - Skylight RenewalUrgent
Steam Boilers - Boilers #1 and #2 RenewalUrgent
Steam Heating Distribution Systems - Pipes and Fittings RenewalUrgent
Auxiliary Equipment - Heat Exchanger - Shell & Tube RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
C302007 Floor Finishes - Painted Sealed Concrete RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Cooling Generating Systems - DX Split RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Pipes and Fittings RenewalHigh
Domestic Water Distribution - Sump Pumps RenewalHigh
Elevators and Lifts - Wheelchair Lift RenewalHigh
Energy Supply System - Natural Gas RenewalHigh
Exhaust Systems - Centrifugal RenewalHigh
Exterior Doors - Hardware RenewalHigh
Exterior Doors - Wood RenewalHigh
Exterior Walls - Deteriorated Exterior Paint Finishes RenewalHigh
Exterior Windows - Wood Framed Single Glazed Units RenewalHigh
Fencing & Gates - Chain Link Fence RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Hardwood RenewalHigh
Floor Finishes - Terrazzo - Washrooms RenewalHigh
Interior Doors - Hardware - Wooden Doors RenewalHigh
Interior Doors - Wooden Doors RenewalHigh
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density RenewalHigh
Lighting and Branch Wiring - Stage Lighting RenewalHigh
Playing Fields - Asphalt Paved RenewalHigh
Playing Fields - Baseball Diamond - Unpaved RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Radiation Units - Perimeter Heating RenewalHigh
Rain Water Drainage RenewalHigh
Roof Coverings - Section C1 RenewalHigh
Sanitary Waste RenewalHigh
Signage - Printed Wall Mounted Sign RenewalHigh
Site Civil/Mechanical Utilities RenewalHigh
Site Development - Concrete Exterior Stairs RenewalHigh
Site Development - Metal Fire Escape RenewalHigh
Wall Finishes - Painted - Aged RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalMedium
Ceiling Finishes - Painted Plaster RenewalMedium
Domestic Water Distribution - DHW Storage Tank #1 RenewalMedium
Exterior Walls - 1910 Building RenewalMedium
Roof Coverings - Seciton F1A RenewalMedium
Wall Finishes - Painted - Ceramic RenewalMedium
Fittings - Aged Chalkboards RenewalLow
Fittings - Window Coverings - Aged RenewalLow
Fittings - Wood Partitions RenewalLow
Floor Finishes - Vinyl Tile - Gym, Classrooms & Corridors - 12 x 12 Tiles RenewalLow
Interior Doors - Glazed Hollow Metal Doors - 10% RenewalLow
Interior Doors - Hardware - Metal Door RenewalLow
Landscaping - Site Landscaping RenewalLow
Partitions - Plaster RenewalLow
Pedestrian Paving - Concrete & Interlocking Brick RenewalLow
Playing Fields - North East Playscapes - Unpaved RenewalLow
Playing Fields - South East Playscapes - Unpaved RenewalLow
Retaining Walls - Wooden Wall RenewalLow