Dovercourt Public School

Facility Condition Index

2024 -2025

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
50.18 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 25,600 different repairs needed in our schools. The total value of those repairs was $4.45 billion as of January 2025.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - HVAC Pumps RenewalUrgent
Auxiliary Equipment - Vacuum Return and Condensate Tanks RenewalUrgent
Exterior Walls - Localized Deficiencies - East Walls RenewalUrgent
Exterior Windows - Original RenewalUrgent
Roof Coverings - Section A1,D1 RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Structural Frame - Localized Deficiencies RenewalUrgent
Auxiliary Equipment - Chemical Feed System - Boiler Room RenewalHigh
B203008 Exterior Doors - Hardware RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalHigh
C103001 Fittings - Washroom Partitions - Water Closet RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Lathe & Plaster RenewalHigh
Domestic Water Distribution - Original Building - Plumbing Piping System RenewalHigh
Exhaust Systems RenewalHigh
Fencing and Gates - Chain Link Fence RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Painted/Sealed Concrete Floor RenewalHigh
Floor Finishes - Wooden - Classroom RenewalHigh
Lighting Equipment - Original Building - Exterior - Wall and Soffit Mounted RenewalHigh
Playing Fields - Unpaved RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Plumbing Fixtures - Water Coolers RenewalHigh
Site Development - Exterior Stairs RenewalHigh
Stormwater Management - Original Building RenewalHigh
Wall Finishes - Painted - Classrooms RenewalHigh
Auxiliary Equipment - Variable Frequency Drives (VFD) RenewalMedium
C102007 Interior Doors - Hardware RenewalMedium
Domestic Water Distribution - Original Building - DWH RenewalMedium
Interior Doors RenewalMedium
Parking Lots - Paved - Asphalt RenewalMedium
Playing Fields - Asphalt School Playground RenewalMedium
Signage RenewalMedium
Ceiling Finishes - Painted Structures RenewalLow
Fittings - Lockers RenewalLow
Fittings - Window Coverings RenewalLow
Interior Stair Construction - Original Building RenewalLow
Landscaping RenewalLow
Pedestrian Paving - Walkway - Concrete Paved RenewalLow
Playing Fields - Henderson Childcare Playscape - Unpaved RenewalLow
Playing Fields - Henderson Oval Playscape RenewalLow
Sanitary Waste RenewalLow

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.