Brief Description | Priority |
Auxiliary Equipment - Expansion Tank Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Exterior Windows - Remaining 50% of the windows Renewal | Urgent |
Heating Water Distribution Systems - Piping Renewal | Urgent |
Hot Water Boilers - Boiler #1 and #2 Renewal | Urgent |
Main Switchboards - Main Disconnect Renewal | Urgent |
Main Switchboards - Main Distribution Renewal | Urgent |
Roof Coverings - Section A,B Renewal | Urgent |
Site Civil/Mechanical Utilities - Original Renewal | Urgent |
Site Electrical Utilities - Original Renewal | Urgent |
Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Auxiliary Equipment - Chemical Feed Renewal | High |
Branch Wiring - 1955 & 1961 Construction Renewal | High |
C1010 Partitions Renewal | High |
C102007 Interior Doors - Hardware Renewal | High |
C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Acoustic Tile Ceiling - Gymnasium Renewal | High |
Controls & Instrumentation - BAS Panel Renewal | High |
Cooling Generating Systems - Window AC Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Domestic Water Distribution - Plumbing Piping System - ALL Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Doors - Painted Hollow Metal Doors Renewal | High |
Exterior Walls - Joint Sealant Renewal | High |
Exterior Walls - Masonry Re-pointing Renewal | High |
Fencing and Gates - Chain Link Fence Renewal | High |
Fittings - Aged Millwork Renewal | High |
Floor Finishes - Hardwood - Gymnasium Renewal | High |
Floor Finishes - Terrazzo - Corridors & Washrooms Renewal | High |
Interior Doors | High |
Lighting Equipment - Wall Lighting Renewal | High |
Parking Lots - Paved - Asphalt Renewal | High |
Perimeter Heating - Terminal Units Renewal | High |
Playing Fields - Unpaved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Plumbing Fixtures - Water Fountains Renewal | High |
Signage - Wall Mounted Renewal | High |
Stormwater Management - Original Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painted - Aged - Drywall and Concrete Block Renewal | High |
C103002 Fittings - Washroom Accessories Renewal | Medium |
C2010 Stair Construction - Metal framed - Corroded Renewal | Medium |
Emergency Lighting and Power - Inverter Renewal | Medium |
Fittings - Aged Window Coverings - Drapes Renewal | Medium |
Roof Coverings - Section E,E2 Renewal | Medium |
Wall Finishes - Washroom Wall Tiles - Ceramic Renewal | Medium |
Ceiling Finishes - 2x4 Suspended Acoustic Ceiling Tiles Renewal | Low |
Fittings - Chalkboards Renewal | Low |
Playing Fields - Henderson Playscape - Unpaved Renewal | Low |