Facility Condition Index

2024 -2025

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
47.79 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 25,600 different repairs needed in our schools. The total value of those repairs was $4.45 billion as of January 2025.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Expansion Tanks RenewalUrgent
Auxiliary Equipment - HVAC Pumps RenewalUrgent
Auxiliary Equipment - Stacks & Breaching RenewalUrgent
Energy Supply System - Natural Gas - Piping RenewalUrgent
Heated Water Distribution Systems - 1966 RenewalUrgent
Hot Water Boilers - Boilers No. 1 & 2 RenewalUrgent
Roof Coverings - Section C,C1,C2,D,E RenewalUrgent
Roofing - Skylights RenewalUrgent
Standard Foundations Repairs - Parging repairs RenewalUrgent
Auxiliary Equipment - Chemical Feed Systems RenewalHigh
Branch Wiring - Cabling, Raceways & Bus Ducts - 1966 RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C302004 Floor Finishes - Vinyl Tile - Older RenewalHigh
C302005 Floor Finishes - Carpet RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Cooling Generating Systems - Condensing Unit RenewalHigh
Cooling Generating Systems - Window AC RenewalHigh
Domestic Water Distribution - DHWT RenewalHigh
Domestic Water Distribution - Pipes and Fittings - 1966 RenewalHigh
Domestic Water Distribution - Sewage Pumps RenewalHigh
Exhaust Systems RenewalHigh
Exterior Doors - Hardware - 1966 RenewalHigh
Exterior Doors - Older RenewalHigh
Exterior Doors - Overhead RenewalHigh
Exterior Walls - Joint Sealant RenewalHigh
Exterior Walls - Masonry Re-pointing RenewalHigh
Fencing & Gates - Chain Link Fence RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Millwork - 1966 Construction RenewalHigh
Floor Finishes - Sheet Vinyl RenewalHigh
Interior Doors - 1966 Construction RenewalHigh
Interior Doors - Hardware - Older RenewalHigh
Parking Lots - North East Side RenewalHigh
Playing Fields - Soccer Field - Unpaved RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Sanitary Waste System - 1966 RenewalHigh
Air Distribution, Heating & Cooling - Ductwork RenewalMedium
C101003 Partitions - Moveable - Foldable Partition (Classroom) RenewalMedium
C302004 Floor Finishes - Vinyl Tile - Newer RenewalMedium
Controls and Instrumentation - BAS RenewalMedium
Domestic Water Distribution - DHW Pumps RenewalMedium
Exterior - Pole RenewalMedium
Fittings - Millwork - 1994 Construction RenewalMedium
Pedestrian Paving - Concrete Paved RenewalMedium
Roadways - Driveway/drop off RenewalMedium
Signage - Wall Mounted RenewalMedium
Site Civil/Mechanical Utilities RenewalMedium
Ceiling Finishes - Cedar RenewalLow
Ceiling Finishes - Suspended Ceiling tiles RenewalLow
Controls & Instrumentation - EMS RenewalLow
Emergency Lighting & Power - Generator RenewalLow
Exterior Doors - Hardware - 1994 RenewalLow
Interior Doors - 1994 Construction RenewalLow
Interior Doors - Hardware - 1994 Construction RenewalLow

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.