Toronto District School Board
Skip to main content

Emily Carr Public School

Facility Condition Index

2024 -2025

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
46.81 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 25,600 different repairs needed in our schools. The total value of those repairs was $4.45 billion as of January 2025.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Expansion Tanks RenewalUrgent
Roof Coverings - Section A,B RenewalUrgent
Roof Coverings - Section A1,B1 RenewalUrgent
Roof Coverings - Section AD1,BD1 RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Air Distribution, Heating & Cooling - Duct System RenewalHigh
Air Handling Units - SF# 1 and #2 RenewalHigh
Branch Wiring RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C103010 Fittings - Millwork - Laboratories RenewalHigh
C302016 Floor Finishes - Rubber - Stair RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Cooling Generating Systems - Carrier Condenser RenewalHigh
Distribution Systems - Exhaust Systems - Axial RenewalHigh
Distribution Systems - Exhaust Systems - Centrifugal RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Hot Water Storage Tank RenewalHigh
Domestic Water Distribution - Plumbing Piping Systems - Original Building RenewalHigh
Exterior Doors - Hardware RenewalHigh
Exterior Doors - Hollow Metal RenewalHigh
Exterior Walls - Joint Sealant RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Carpet RenewalHigh
Floor Finishes - Sheet Vinyl RenewalHigh
Lighting Equipment - Exterior RenewalHigh
Main Switchboards - Main Switchgear RenewalHigh
Playing Fields - Playground - Paved RenewalHigh
Playing Fields - Unpaved RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Terminal & Package Units - Unit Ventilators RenewalHigh
Auxiliary Equipment - Chemical Feed System RenewalMedium
Controls and Instrumentation - BAS RenewalMedium
Fencing & Gates - Fencing RenewalMedium
Fencing & Gates RenewalMedium
Fin Tube Radiation Units - Perimeter Heating RenewalMedium
Floor Finishes - Ceramic Flooring RenewalMedium
Floor Finishes - Hardwood RenewalMedium
Floor Finishes - Vinyl Tiles RenewalMedium
Interior Doors - Hardware RenewalMedium
Parking Lots RenewalMedium
Playing Fields - Baseball Gravel - Unpaved RenewalMedium
Playing Fields - Paved RenewalMedium
Plumbing Fixtures - Lavatories RenewalMedium
Plumbing Fixtures - Urinals RenewalMedium
Ceiling Finishes - Suspended Acoustic Tiles RenewalLow
Controls & Instrumentation - EMS RenewalLow
Fittings - Basketball Nets RenewalLow
Fittings - Lockers & Chalkboards RenewalLow
Fittings - Window Coverings RenewalLow
Interior Doors - Original Building RenewalLow
Landscaping RenewalLow
Wall Finishes - Painted RenewalLow

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.