The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
63.74 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 25,600 different repairs needed in our schools. The total value of those repairs was $4.45 billion as of January 2025.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Expansion Tank RenewalUrgent
Main Switchboards - Switchgear RenewalUrgent
Roof Coverings - Sections A RenewalUrgent
Secondary - Transformers RenewalUrgent
Site Civil/Mechanical Utilities - 1971 Construction RenewalUrgent
Air Distribution, Heating & Cooling - Duct System RenewalHigh
Auxiliary Equipment - Chemical Feed System RenewalHigh
Branch Wiring - Cabling, Raceways & Bus Ducts RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C103010 Fittings - Millwork - Laboratories RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Coffered/Suspended ceiling panels RenewalHigh
Domestic Water Distribution - Electric Hot Water Heaters - DHWH #1 RenewalHigh
Domestic Water Distribution - Electric Hot Water Heaters - DHWH #2 RenewalHigh
Domestic Water Distribution - Electric Hot Water Heaters - DHWH #3 and #4 RenewalHigh
Domestic Water Distribution - Electric Hot Water Heaters - DHWH #5 RenewalHigh
Domestic Water Distribution - Electric Hot Water Heaters - DHWH #6 RenewalHigh
Domestic Water Distribution - Pipes and Fittings RenewalHigh
Domestic Water Distribution - Pumps DHW RenewalHigh
Drinking Fountains and Coolers - Water Coolers RenewalHigh
Exhaust Systems RenewalHigh
Exterior Doors - All RenewalHigh
Exterior Walls - Joint Sealant - Precast RenewalHigh
Exterior Windows - Original Building RenewalHigh
Fencing & Gates - Chain link fence RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Carpet RenewalHigh
Forced Flow Heaters RenewalHigh
Lighting Equipment - Exterior - Wall Mounted RenewalHigh
Parking Lot/Bus Loop - Asphalt RenewalHigh
Partitions - Original Building RenewalHigh
Playing Fields - Unpaved RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Rain Water Drainage RenewalHigh
Sanitary Waste - Piping RenewalHigh
Signage RenewalHigh
Site Development - Exterior Stairs - Concrete Exterior Stairs - W RenewalHigh
Standard Foundations Repairs - Crack Injection - SE RenewalHigh
Standard Foundations Repairs - Damp proofing Repairs - SW RenewalHigh
Stormwater Management RenewalHigh
C103002 Fittings - Washroom Accessories RenewalMedium
Emergency Lighting & Power - Inverter RenewalMedium
Exterior Doors - Hardware RenewalMedium
Floor Finishes - Rubber RenewalMedium
Interior Doors - Hardware RenewalMedium
Interior Doors RenewalMedium
Pedestrian Paving - Walkways RenewalMedium
Playing Fields - Asphalt School Playground - E, N, W RenewalMedium
Wall Finishes - Painted RenewalMedium
Controls & Instrumentation - Energy Management System - Review/Locked RenewalLow
Landscaping RenewalLow