Toronto District School Board
Skip to main content

Eastview Public School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
40.72 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
A101004 Standard Foundations Repairs - Parging repairs RenewalUrgent
Main Switchboards - Main Switchgear #1 and #2 RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Air Handling Units - Supply Fans RenewalHigh
Auxiliary Equipment - HVAC Pumps RenewalHigh
B201014 Exterior Walls - Masonry Re-pointing - Localized Deficiencies RenewalHigh
B203008 Exterior Doors - Hardware RenewalHigh
Branch Wiring RenewalHigh
C103001 Fittings - Washroom Partitions - Water Closet RenewalHigh
C103002 Fittings - Washroom Accessories RenewalHigh
C103009 Fittings - Millwork - Classrooms - Older RenewalHigh
C302002 Floor Finishes - Terrazzo - Localized Deficiencies RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Domestic Water Distribution - Pipes and Fittings RenewalHigh
Exhaust Systems RenewalHigh
Exterior Doors - Hollow Metal - Phase II RenewalHigh
Floor Finishes - Carpet RenewalHigh
G202003 Parking Lots - Paved - Asphalt - Older RenewalHigh
G204071 Playing Fields - Unpaved RenewalHigh
Lighting Equipment - Exterior RenewalHigh
Perimiter Heating - Terminal Units RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Plumbing Fixtures - Water Coolers RenewalHigh
Roof Top AHU - Heat & Cool - RTU #3,#4,#5 and #6 RenewalHigh
Stormwater Management RenewalHigh
Wall Finishes - Paint Wallcovering RenewalHigh
C102007 Interior Doors - Hardware RenewalMedium
Ceiling Finishes - Suspended Ceiling Tiles & Acoustic Tile Ceiling RenewalMedium
Domestic Water Distribution - Natural Gas DWH - 2004 RenewalMedium
Domestic Water Distribution - Natural Gas DWH - 2010 RenewalMedium
Interior Doors - Wood & Hollow Metal RenewalMedium
Interior Stair Construction - Metal Frame RenewalMedium
Pedestrian Paving - Concrete & Asphalt RenewalMedium
Roof Coverings - Section A,AB1,CD1 RenewalMedium
Cooling Generating Systems - Condenser Unit #1 RenewalLow
Domestic Water Distribution - Electric Hot Water Heaters - 2011 RenewalLow
Fencing & Gates - Chain link Fence RenewalLow
Pedestrian Paving - Barrier Gate RenewalLow
Signage RenewalLow