Cedarbrook Public School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
52.15 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Stacks & Breaching RenewalUrgent
Hot Water Boilers - Boiler #1 and # 2 RenewalUrgent
Roof Coverings - Built-Up Asphaltic Membrane Assemblies - Sections B2, and C3 RenewalUrgent
Air Handling Units - Gymnasium RenewalHigh
B201014 Exterior Walls - Masonry Re-pointing RenewalHigh
Branch Wiring - Cabling, Raceways & Bus Ducts RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C301005 Wall Finishes - Paint - Localized Deficiencies RenewalHigh
C302002 Floor Finishes - Terrazzo - Localized Deficiencies RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Acoustic Tile Ceiling RenewalHigh
Controls and Instrumentation - Electronic/BAS RenewalHigh
Distribution Systems - Heated Water Distribution Systems - Piping System RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Electric Hot Water Heater RenewalHigh
Energy Supply System - Natural Gas Piping RenewalHigh
Exterior Doors - Hardware - Entire School RenewalHigh
Exterior Doors - Hollow Metal - Entire School RenewalHigh
Exterior Windows - Aged Windows RenewalHigh
Fencing & Gates - Chain Link Fence - 6 feet high RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Carpet - Entire School RenewalHigh
Floor Finishes - Hardwood - Gymnasium and Stage RenewalHigh
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs RenewalHigh
G204071 Playing Fields - Unpaved RenewalHigh
Interior Doors - Hardware RenewalHigh
Interior Doors - Metal and Wood Doors RenewalHigh
Parking Lots - Asphalt Paved Parking Lots RenewalHigh
Playing Fields - Asphalt Paved RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Terminal and Package Units - Unit Ventilators RenewalHigh
Underground Utilities RenewalHigh
Auxiliary Equipment - HVAC Pumps RenewalMedium
C1010 Partitions - Localized Deficiencies RenewalMedium
Domestic Water Distribution - Pipes and Fittings RenewalMedium
Interior Stair Construction RenewalMedium
Stormwater Management RenewalMedium
Air Distribution, Heating & Cooling - Duct System RenewalLow
Fittings - Chalkboards RenewalLow
Landscaping RenewalLow
Pedestrian Paving - Concrete Paved Walkway RenewalLow
Pedestrian Paving - Traffic Control Device RenewalLow
Signage - Wall Mounted RenewalLow
Wall Finishes - C3010 Wall Finishes - Painted - Entire School RenewalLow
Wall Finishes - Paint RenewalLow