Toronto District School Board
Skip to main content

Cedar Drive Junior Public School

Facility Condition Index

2024 -2025

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
58.54 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 25,600 different repairs needed in our schools. The total value of those repairs was $4.45 billion as of January 2025.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Expansion Tanks RenewalUrgent
Auxiliary Equipment - HVAC Pumps RenewalUrgent
Auxiliary Equipment - Humidifiers RenewalUrgent
Elevators and Lifts - Wheelchair Lift RenewalUrgent
Exterior Windows - Original Building RenewalUrgent
Main Switchboards - Switchgear Unit #1 RenewalUrgent
Roof Coverings - Section C RenewalUrgent
Roof Coverings - Section C2,A1 RenewalUrgent
Secondary Transformers RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Air Distribution, Heating & Cooling - Ductwork RenewalHigh
Auxiliary Equipment - Chemical Feed System RenewalHigh
Branch Wiring - Cabling, Raceways & Bus Ducts - 1970 RenewalHigh
C101003 Partitions - Moveable - Foldable Partition (GYM) RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C302002 Floor Finishes - Terrazzo - Epoxy RenewalHigh
Ceiling Finishes - Suspended Acoustic Panel Ceilings - 1968 Construction RenewalHigh
Controls and Instrumentation - Electronic/BAS RenewalHigh
Cooling Generating Systems - AC#1 and #2 RenewalHigh
Cooling Generating Systems - AC#3 RenewalHigh
Domestic Water Distribution - DHWT #1 and #2 RenewalHigh
Domestic Water Distribution - DHWT #3 RenewalHigh
Domestic Water Distribution - DHWT #4 RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Pipes and Fittings - 1970 RenewalHigh
Exhaust Systems RenewalHigh
Exhaust Systems RenewalHigh
Exit Lighting and Signs RenewalHigh
Exterior Doors - 1996 Addition RenewalHigh
Exterior Doors - Hardware - Original Building and Addition 1 RenewalHigh
Exterior Lighting - Pole Mounted RenewalHigh
Exterior Lighting - Wall Mounted RenewalHigh
Exterior Walls - Joint Sealant RenewalHigh
Exterior Walls - Precast Wall Panels - Localized Deficiencies RenewalHigh
Fencing & Gates - Chain-Link Fencing RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Millwork - 1968 Construction RenewalHigh
Floor Finishes - Carpet RenewalHigh
Floor Finishes - Gymnasium Hardwood Floor RenewalHigh
Floor Finishes - Sheet Vinyl Floor RenewalHigh
Floor Finishes - Vinyl Tile - Original Tile RenewalHigh
Interior Doors - Hardware - Original Building and Addition 1 RenewalHigh
Lighting Equipment - Interior Lighting RenewalHigh
Playing Fields - Grass Surfaced RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Roof Top AHU - Heat & Cool - RTU #1, #2, #3 and #4 RenewalHigh
Terminal and Package Units - Unit Ventilators RenewalHigh
Air Handling Units - AHU #1, #2 and #3 RenewalMedium
C101003 Partitions - Moveable - Foldable Partition (Classroom) RenewalMedium
Domestic Water Distribution - Drinking Fountains and Coolers RenewalMedium
Energy Supply System - Natural Gas - Piping RenewalMedium
Exterior Doors - Hardware - 1996 Addition RenewalMedium
Floor Finishes - Vinyl Tile - Upgraded Tile RenewalMedium
Hot Water Boilers - Boiler #1, #2, #3, #4 and #5 RenewalMedium
Interior Doors - Metal and Wood Doors - 1968 Construction RenewalMedium
Rain Water Drainage RenewalMedium
Roadways - Asphalt Paved Roadway RenewalMedium
Sanitary Waste RenewalMedium
Signage - Boulevard Sign RenewalMedium
Signage - Wall Mounted RenewalMedium
Structural Columns and Beams - Localized Deficiencies RenewalMedium
Exterior Doors - Automatic Device RenewalLow
Interior Doors - Hardware - 1996 Addition RenewalLow
Interior Stair Construction - 1968 Construction RenewalLow
Landscaping RenewalLow
Parking Lots - North and East lots RenewalLow
Pedestrian Paving - Swing gate RenewalLow
Wall Finishes - 1996 Addition - Painted Walls RenewalLow
Wall Finishes - Painted - Original Building and Addition 1 RenewalLow
Wall Finishes - Painted RenewalLow

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.