Winston Churchill Collegiate Institute

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
67.94 %

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Condensate and Blowdown Tanks RenewalUrgent
Auxiliary Equipment - Expansion Tanks RenewalUrgent
Auxiliary Equipment - HVAC Pumps RenewalUrgent
Auxiliary Equipment - Variable Frequency Drives (VFD) RenewalUrgent
Exterior Windows RenewalUrgent
Heating Water Distribution Systems - Heating Piping System RenewalUrgent
Roof Coverings - Section G,H1,H2,I1,J RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Air Distribution, Heating & Cooling - Ductwork RenewalHigh
Auxiliary Equipment - Chemical Feed System RenewalHigh
Branch Wiring - Cabling, Raceways & Bus Ducts RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalHigh
C101003 Partitions - Moveable - Foldable Partition (GYM) - Older RenewalHigh
C1030 - Fittings - Washroom - Older RenewalHigh
C103009 Fittings - Millwork - Laboratories - Older RenewalHigh
C302004 Floor Finishes - Vinyl Tile - Older RenewalHigh
Ceiling Finishes - Acoustic Tiles Ceiling - Older RenewalHigh
Controls & Instrumentation - EMS RenewalHigh
Controls & Instrumentation - Pneumatic RenewalHigh
Cooling Generating Systems - Rooftop Condenser - #3 RenewalHigh
Domestic Water Distribution - DHWH #1 and #2 RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Eyewash Stations RenewalHigh
Domestic Water Distribution - Pipes and Fittings RenewalHigh
Exhaust Systems RenewalHigh
Exhaust Systems RenewalHigh
Exterior Doors - Hardware RenewalHigh
Exterior Doors - Overhead and Roll - up RenewalHigh
Exterior Doors RenewalHigh
Exterior Lighting - Wall Mounted RenewalHigh
Exterior Walls - EIFS RenewalHigh
Exterior Walls - Joint Sealant RenewalHigh
Exterior Walls - Masonry Re-pointing RenewalHigh
Exterior Windows RenewalHigh
Fencing & Gates - Chain Link Fencing - Site RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Gymnasium Bleachers - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 RenewalHigh
Fittings - Millwork - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 RenewalHigh
Floor Finishes - Carpet RenewalHigh
Floor Finishes - Hardwood - Gymnasium and Wood Shop RenewalHigh
Floor Finishes - Painted Concrete Floor RenewalHigh
Floor Finishes - Terrazzo - Older RenewalHigh
Interior Doors - Hardware - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 RenewalHigh
Interior Doors - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 RenewalHigh
Lighting Equipment - Interior Lighting RenewalHigh
Lighting and Branch Wiring - Stage Lighting RenewalHigh
Other Special Systems and Devices - Dust Collector RenewalHigh
Parking Lots - Asphalt - Site RenewalHigh
Pedestrian Paving - Asphalt - Site RenewalHigh
Pedestrian Paving - Poured Concrete - Site RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Rain Water Drainage - Sump Pumps RenewalHigh
Roadways - Driveway & Drop off - Site RenewalHigh
Sanitary Waste RenewalHigh
Signage - Wall-mounted and Lawn Signs - Site RenewalHigh
Stormwater Management RenewalHigh
Wall Finishes - Painted - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 RenewalHigh
Controls & Instrumentation - BAS RenewalMedium
Cooling Generating Systems - Rooftop Condensers #1, #2 and #4 RenewalMedium
Exit Lighting and Signs RenewalMedium
Fencing & Gates - Cafeteria Stair/Ramp RenewalMedium
Fencing & Gates - Field Stairs RenewalMedium
Floor Finishes - Carpet - Upgraded RenewalMedium
Floor Finishes - Vinyl Tile - Upgraded RenewalMedium
Playing Fields - Upgrade Surface - Unpaved RenewalMedium
Wall Finishes - Ceramic Wall Tiles - Washrooms RenewalMedium
Wall Finishes - Wood Paneling RenewalMedium
Ceiling Finishes - Tectum Ceiling Panels RenewalLow
Fittings - Auto Hoists - Aboveground RenewalLow
Fittings - Auto Hoists - In-ground RenewalLow
Fittings - Chalkboards RenewalLow
Fittings - Drapes RenewalLow
Fittings - Dust Collector RenewalLow
Landscaping - 1953 Construction RenewalLow
Pedestrian Paving - Swing Gate - East RenewalLow
Pedestrian Paving - Swing Gates - West RenewalLow
Wall Finishes - Repainted Corridors RenewalLow

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.