Brief Description | Priority |
Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
Distribution Systems - Heated Water/Steam Distribution Systems - Piping System Renewal | Urgent |
Roof Coverings - Section A,B2,C2,C6,D1,G,H1,H2,I1,J Renewal | Urgent |
Site Civil/Mechanical Utilities - Site Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201012 Exterior Walls - EIFS Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing - Older Renewal | High |
B2020 Exterior Windows - Older Renewal | High |
B203004 Exterior Doors - Overhead and Roll - up Renewal | High |
Branch Wiring Renewal | High |
C1030 - Fittings - Washroom - Older Renewal | High |
C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
Ceiling Finishes - Acoustic Tiles Ceiling - Older Renewal | High |
Controls & Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - Rooftop Condenser - #3 Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Exterior Doors - Hardware - Older Renewal | High |
Exterior Doors - Older Renewal | High |
Exterior Windows - Library Addition Renewal | High |
Fencing & Gates - Chain Link Fencing - Site Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Gymnasium Bleachers - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 Renewal | High |
Fittings - Metal Lockers - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes - Hardwood - Gymnasium and Wood Shop Renewal | High |
Floor Finishes - Painted Concrete Floor Renewal | High |
Floor Finishes - Terrazzo - Older Renewal | High |
Interior Doors - Hardware - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 Renewal | High |
Interior Doors - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Wall Renewal | High |
Lighting and Branch Wiring - Stage Lighting Renewal | High |
Parking Lots - Asphalt - Site Renewal | High |
Pedestrian Paving - Asphalt - Site Renewal | High |
Pedestrian Paving - Poured Concrete - Site Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Roadways - Driveway & Drop off - Site Renewal | High |
Sanitary Waste - Piping Renewal | High |
Signage - Wall-mounted and Lawn Signs - Site Renewal | High |
Stormwater Management Renewal | High |
Wall Finishes - Painted - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 Renewal | High |
Auxiliary Equipment - Variable Frequency Drives Renewal | Medium |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) - Older Renewal | Medium |
C103009 Fittings - Millwork - Laboratories - Older Renewal | Medium |
Domestic Water Distribution - DHWH #1 and #2 Renewal | Medium |
Fittings - Millwork - Original Building & Additions 1, 2, 3, 4, 5, 6 and 7 Renewal | Medium |
Wall Finishes - Ceramic Wall Tiles - Washrooms Renewal | Medium |
Wall Finishes - Wood Paneling Renewal | Medium |
Controls & Instrumentation - BAS Renewal | Low |
Cooling Generating Systems - Rooftop Condensers #1, #2 and #4 Renewal | Low |
Floor Finishes - Carpet - Upgraded Renewal | Low |
Playing Fields - Upgrade Surface - Unpaved Renewal | Low |