Brief Description | Priority |
A101004 Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
A101004 Standard Foundations Repairs - Parging repairs - Localized Deficiencies Renewal | Urgent |
Auxiliary Equipment - Expansion Tank Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Heat Exchanger - Shell & Tube Renewal | Urgent |
Auxiliary Equipment - Humidifiers Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching - Boiler #3 Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching - Boilers #1 and #2 Renewal | Urgent |
Cooling Generating Systems - AC #3, #4 and #5 Renewal | Urgent |
Electrical Service and Distribution - Motor Control Centre Renewal | Urgent |
Electrical Service and Distribution - Panelboards Renewal | Urgent |
Heated Water Distribution Systems - HTG Piping (1963 and 1971) - Level 1 Renewal | Urgent |
Heated Water Distribution Systems - HTG Piping (1963 and 1971) - Level 2 Renewal | Urgent |
Hot Water Boilers - Bolier #3 - DHW - Building Renewal | Urgent |
Hot Water Boilers - Boilers #1 and #2 Renewal | Urgent |
Interior Stair Construction Renewal | Urgent |
Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | Urgent |
Main Switchboards - Switchgear Renewal | Urgent |
Roof Coverings - Section F1,AB1 Renewal | Urgent |
Secondary Transformer - Substation Renewal | Urgent |
Air Handling Units - SF #2, #8, #9, #11, #12, #13 Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103009 Fittings - Millwork - Laboratories Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Specialty Roof Finishes Renewal | High |
Ceiling Finishes - Suspended Ceiling Panels Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - Window AC Renewal | High |
Domestic Water Distribution - DHW Storage Tank Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Domestic Water Distribution - Pool Sump Pumps Renewal | High |
Energy Supply System - Natural Gas Renewal | High |
Exhaust Systems - Axial Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Fencing & Gates - Chain Link Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Bleachers Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes - Terrazzo Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Interior Doors - Hardware Renewal | High |
Interior Doors Renewal | High |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Medium Density Renewal | High |
Other HVAC Systems and Equipment - Refrigeration Systems - Freezer/Cooler Renewal | High |
Parking Lots - Asphalt Renewal | High |
Pedestrian Paving Renewal | High |
Playing Fields - Field Renewal | High |
Playing Fields - Track Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Sanitary Waste Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painting Renewal | High |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Floor Finishes - Ceramic Tile Renewal | Medium |
Floor Finishes - Gym Floor System Renewal | Medium |
Landscaping Renewal | Medium |
Partitions - Localized Damage Renewal | Medium |