Brief Description | Priority |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Exterior Windows Renewal | Urgent |
Playing Fields - Paved Playgrounds Renewal | Urgent |
Roof Coverings - Section C,CD1,A,A3 Renewal | Urgent |
Air Handling Units - Central station - AHUs Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201016 Exterior Walls - Precast Wall Panels - Localized Deficiencies Renewal | High |
B2030 Exterior Doors - Hollow Metal Renewal | High |
B203004 Exterior Doors - Overhead and Roll - up Renewal | High |
B203008 Exterior Doors - Hardware Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103009 Fittings - Millwork - Laboratories - Older Renewal | High |
C103017 Fittings - Auditorium Seating - Lecture Room Renewal | High |
C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
Ceiling Finishes - Acoustic Ceiling Tiles Renewal | High |
Controls & Instrumentation - Penumatic Renewal | High |
D201001 Plumbing Fixtures - Water Closets Renewal | High |
D202001 Domestic Water Distribution - Pipes and Fittings Renewal | High |
D202034 Domestic Water Distribution - Water Storage Tanks Renewal | High |
D502001 Lighting and Branch Wiring - Branch Wiring Renewal | High |
D502004 Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | High |
D502004 Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
Domestic Water Distribution - Sump Pumps Renewal | High |
Elevators & Lifts - Passenger Elevator Renewal | High |
Exhaust Systems - Exhaust fans Renewal | High |
Fencing & Gates - Site Improvements Renewal | High |
Fittings - Lockers Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Sheet Vinyl Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Heating/Chilling water distribution systems - HTG & CLG Piping System Renewal | High |
Hot Water Boilers - Boiler - 1 Renewal | High |
Interior Doors Renewal | High |
Interior Stair Construction Renewal | High |
Main Switchboards - Main Disconnect Renewal | High |
Parking Lots Renewal | High |
Partitions - Localized Deficiencies Renewal | High |
Pedestrian Paving Renewal | High |
Playing Fields - Unpaved Sports & Recreational Spaces Renewal | High |
Roof Coverings - Section A,A3,B,B1,CD2 Renewal | High |
Roof Openings - Skylight - Greenhouse AC1,AC2,AC3 Renewal | High |
Secondary Transformer Renewal | High |
Signage Renewal | High |
Terminal & Package Units - Fin Tube Units Renewal | High |
Wall Finishes - Paint Renewal | High |
Air Distribution, Heating & Cooling - Ductwork Renewal | Medium |
Auxiliary Equipment - Chemical Feed Systems Renewal | Medium |
Auxiliary Equipment - Circ Pumps Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
D201003 Plumbing Fixtures - Lavatories Renewal | Medium |
D201006 Domestic Water Distribution - Drinking Fountains and Coolers Renewal | Medium |
D303012 Chilled Water Systems - Cooling Towers Renewal | Medium |
Hot Water Boilers - Pool Boiler Renewal | Medium |
Lighting Equipment - Interior Lighting Renewal | Medium |
Lighting Equipment - Pool Lighting - HPS Renewal | Medium |
Other Cooling Generating Systems - RT A/C COND Units Renewal | Medium |
Other Special Plumbing Systems - Pool Renewal | Medium |
Other Special Plumbing Systems - Pool Renewal | Medium |
Rain Water Drainage Renewal | Medium |
Sanitary Waste Renewal | Medium |
Site Civil/Mechanical Utilities Renewal | Medium |
Stormwater Management Renewal | Medium |
Emergency Lighting & Power - Generator Renewal | Low |
Fittings - Auto Hoist Renewal | Low |
Interior Doors - Hardware Renewal | Low |