Brief Description | Priority |
A101004 Standard Foundations Repairs - Damp proofing Repairs - Pool Tunnel Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Roof Coverings - Skylight Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Units - SF #1 - #13 Renewal | High |
Auxiliary Equipment - Expansion Tanks Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
Ceiling Finishes - 12" X 12" Acoustic Ceiling Tile Renewal | High |
Ceiling Finishes - Suspended Acoustic Panel Ceiling - Original Building and Addition 1 Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Sump pumps Renewal | High |
Exterior Doors - Hardware - Older Renewal | High |
Exterior Doors - Hollow Metal Doors Renewal | High |
Exterior Windows - Single Glazed - Older Renewal | High |
Fencing & Gates - Chain Link Fence Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Bleachers - Double Gymnasium Renewal | High |
Fittings - Classroom Millwork - Original Building and Addition 1 Renewal | High |
Fittings - Metal Lockers - Original Building and Addition 1 Renewal | High |
Fittings - Millwork - Laboratory Benches Renewal | High |
Floor Finishes - Carpet - Library, Recording Studio and Drama room Renewal | High |
Floor Finishes - Hardwood - Double Gymnasium Renewal | High |
Floor Finishes - Pool & Deck Renewal | High |
Heating Water Distribution Systems - Piping Renewal | High |
Interior Doors - Hardware - Aged Renewal | High |
Interior Doors - Wood & Hollow Metal Doors Renewal | High |
Parking Lots - Asphalt Paved - Site Renewal | High |
Pedestrian Paving - Asphalt Paved - Site Renewal | High |
Pedestrian Paving - Concrete Paved - Site Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Retaining Walls - Concrete Renewal | High |
Retaining Walls - Railway ties Renewal | High |
Roadways - Asphalt Paved - Site Renewal | High |
Sanitary Waste - Piping Renewal | High |
Signage - Wall Mounted & Boulevard Renewal | High |
Structural Frame - Original Building and Addition 1 Renewal | High |
Wall Finishes - Acoustic Panels - Music Room Renewal | High |
Wall Finishes - Painted Renewal | High |
Branch Wiring Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | Medium |
Domestic Water Distribution - Pipes and Fittings Renewal | Medium |
Interior Stair Construction - Steel framed with terrazzo treads Renewal | Medium |
Site Civil Utilities - Underground Utilities - Site Renewal | Medium |
Wall Finishes - Ceramic wall tiles Renewal | Medium |
B203008 Exterior Doors - Hardware - Newer Renewal | Low |
Controls and Instrumentation - BAS Renewal | Low |