Brief Description | Priority |
Electrical Service and Distribution - Panelboards Renewal | Urgent |
Main Switchboards - Switchgear Renewal | Urgent |
Roof Coverings - Section A,B,C4,D,E,E1 Renewal | Urgent |
Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Air Handling Units - North & South Gyms Renewal | High |
Auxiliary Equipment - Expansion Tank Renewal | High |
Auxiliary Equipment - Variable Frequency Drives (VFD) Renewal | High |
C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - Packaged Terminal Window A/C Renewal | High |
Distribution Systems - Air Distribution, Heating & Cooling - Duct System Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
Domestic Water Distribution - DHWH #1 Renewal | High |
Exterior Doors - Hardware - 1960 to 1965 Construction Renewal | High |
Exterior Doors - Hollow Metal Renewal | High |
Exterior Windows - Sealant Replacement Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Floor Finishes - Carpet Renewal | High |
Heating Water Distribution Systems - Hot Water Piping System Renewal | High |
Interior Stair Construction - Stair 3 Renewal | High |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted - New Renewal | High |
Parking Lots - Paved Parking and Walkways Renewal | High |
Playing Fields - Asphalt Paved Play Area Renewal | High |
Playing Fields - Soccer Field and Baseball Field - Unpaved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Washroom Renewal | High |
Roadways - Dropoff Area Renewal | High |
Sanitary Waste Renewal | High |
Stormwater Management - Catch Basins Renewal | High |
Underground Utilities Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C1030 - Fittings - Washroom - Marble Renewal | Medium |
Ceiling Finishes - Acoustic Ceiling Tiles (1' x 1') Renewal | Medium |
Ceiling Finishes - Acoustic Ceiling Tiles - Common Areas (2' x 4') Renewal | Medium |
Domestic Water Distribution - DHWH #2 Renewal | Medium |
Domestic Water Distribution - Pipes and Fittings Renewal | Medium |
Fittings - Millwork - Benches, Counters and Boot Racks Renewal | Medium |
Floor Finishes [Ceramic] Renewal | Medium |
Interior Doors - Hardware Renewal | Medium |
Interior Doors - Wooden Renewal | Medium |
Pedestrian Paving - Concrete Walkway Renewal | Medium |
Wall Finishes - Painted - Classrooms and Common Corridors Renewal | Medium |
Controls & Instrumentation - BAS Renewal | Low |
Fencing & Gates - Chain Link Fence Renewal | Low |
Fittings - Drapes Renewal | Low |
Fittings - Horizontal Blinds Renewal | Low |
Playing Fields - Daycare Playscape - Unpaved Renewal | Low |
Playing Fields - Elementary Henderson Playscape - Unpaved Renewal | Low |