Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
47.31 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Standard Foundations - Localized Deterioration RenewalUrgent
B201015 Exterior Walls - Metal Siding RenewalHigh
Cooling Generating Systems - CU #1, #2 and #3 RenewalHigh
Distribution Systems - Exhaust Systems - Axial RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Electrical Service and Distribution - Panelboards RenewalHigh
Exterior Doors - Metal RenewalHigh
Exterior Walls - Stucco RenewalHigh
Exterior Windows - 1975 Construction RenewalHigh
Fan Coil Units - Forced Flow Heaters RenewalHigh
Floor Finishes - Terrazzo - Washrooms RenewalHigh
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs RenewalHigh
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalHigh
Main Switchboards - Main Switchgear RenewalHigh
Parking Lots - West Lot RenewalHigh
Pedestrian Paving - Concrete & Asphalt RenewalHigh
Playing Fields - Asphalt Playground - Paved RenewalHigh
Playing Fields - Field - Unpaved RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Washroom RenewalHigh
Retaining Walls - Timber RenewalHigh
Roof Top AHU - RTU #1, #2 and #3 RenewalHigh
C1030 - Fittings - Washroom RenewalMedium
Ceiling Finishes - Suspended Acoustic Panels RenewalMedium
Domestic Water Distribution - DWH #1 and #2 RenewalMedium
Exterior Doors - Hardware RenewalMedium
Fittings - Millwork - Cabinetry RenewalMedium
Floor Finishes - Gymnasium [Wood Strip] RenewalMedium
Interior Doors - Hardware RenewalMedium
Interior Doors - Wood & Metal RenewalMedium
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density RenewalMedium
Wall Finishes - Paint RenewalMedium
Fencing & Gates - Chain Link Fence RenewalLow
Floor Finishes - Vinyl Tile RenewalLow
Landscaping RenewalLow
Plumbing Fixtures - Water Closets RenewalLow
Signage - Wall-Mounted & Boulevard Signs RenewalLow
Stormwater Management RenewalLow