A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | Urgent |
Hot Water Boilers - Boiler #1 and #2 Renewal | Urgent |
Main Switchboards - Main Switchgear Renewal | Urgent |
Secondary - Secondary Transformers Renewal | Urgent |
Site Civil/Mechanical Utilities - 1959 Construction Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Units - Central Station AHUs Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
Branch Wiring Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103013 Fittings - Retractable Stage Renewal | High |
C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
Ceiling Finishes - Acoustic Tile Ceilings Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
Domestic Water Distribution - DHWH #2 Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Energy Supply System - Natural Gas - Piping Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Doors - Hollow Metal Doors Renewal | High |
Exterior Walls - Deteriorated Brick Renewal | High |
Fencing & Gates - Original Fencing Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Carpet Flooring Renewal | High |
Floor Finishes - Hardwood Flooring Renewal | High |
Floor Finishes - Painted Concrete Flooring Renewal | High |
Interior Doors - Hardware Renewal | High |
Interior Doors - Wood & Hollow Metal Doors Renewal | High |
Lighting Equipment - Exterior - Wall Renewal | High |
Pedestrian Paving - Concrete & Asphalt Renewal | High |
Playing Fields - Unpaved Renewal | High |
Playing Fields - West & South Playgrounds - Paved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Roadways - North & South Driveways Renewal | High |
Sanitary Waste - Piping Renewal | High |
Signage - Wall Mounted Renewal | High |
Wall Finishes - Paint Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
Roof Coverings - Section B2E Renewal | Medium |
Barrier Free Upgrades Renewal | Low |
Domestic Water Distribution - DHW Circulation Pumps Renewal | Low |
Domestic Water Distribution - DHWH #1 Renewal | Low |
Floor Finishes - Vinyl Tile - Upgraded Renewal | Low |
Landscaping - 1959 Construction Renewal | Low |
Playing Fields - Belair Childcare Playscape - Unpaved Renewal | Low |
Stormwater Management Renewal | Low |
Wall Finishes - Wood Paneling Renewal | Low |