Braeburn Junior School

Facility Condition Index

2020 -2021

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
61.03 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $3.7 billion as of May 2021.

For the 2020-2021 school year, the TDSB  received $312 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Air Handling Units - Classroom Supply RenewalUrgent
Air Handling Units - Gymnasium RenewalUrgent
Controls & Instrumentation - Pneumatic system RenewalUrgent
Domestic Water Distribution - Plumbing Piping RenewalUrgent
Exterior Doors RenewalUrgent
Exterior Windows RenewalUrgent
Fittings - Millwork RenewalUrgent
Fittings - Washroom Accessories RenewalUrgent
Floor Finishes - Carpet RenewalUrgent
Floor Finishes - Vinyl tiles RenewalUrgent
Heating/Chilling water distribution systems RenewalUrgent
Main Switchboards RenewalUrgent
Playing Fields - Paved RenewalUrgent
Retaining Walls - Parking Lot RenewalUrgent
Terminal & Package Units RenewalUrgent
Branch Wiring RenewalHigh
Exhaust Systems RenewalHigh
Interior Doors RenewalHigh
Parking Lots RenewalHigh
Partitions - Localized Deficiencies RenewalHigh
Partitions - Moveable RenewalHigh
Pedestrian Paving RenewalHigh
Playing Fields - Unpaved RenewalHigh
Plumbing Fixtures RenewalHigh
Stormwater Management - Original Building RenewalHigh
Ceiling Finishes - Acoustic Ceiling Tile RenewalMedium
Ceiling Finishes - Gypsum Board Ceiling (Washrooms, Entrances) RenewalMedium
Electrical Service and Distribution - Panel (600, 220, 120 V) RenewalMedium
Roof Coverings - Section A,A2,A3,A4 RenewalMedium
Wall Finishes - Paint RenewalMedium
BAS Operating System Upgrade - to deleteLow
Controls & Instrumentation - BAS RenewalLow
Fencing & Gates - Fencing RenewalLow
Fencing & Gates - Stairs, Plazas & Decks RenewalLow
Fencing & Gates - Storage Bunkers RenewalLow
Fittings - Folding tables RenewalLow
Fittings - Window Coverings RenewalLow
Floor Finishes - Vinyl Sheet Floor (Classroom 13A) RenewalLow
Floor Finishes RenewalLow
Interior Doors - Hardware RenewalLow
Landscaping RenewalLow
Lighting Equipment - Exit RenewalLow
Playing Fields - Playscapes RenewalLow
Rain Water Drainage RenewalLow
Sanitary Waste RenewalLow
Signage RenewalLow