Brief Description | Priority |
Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
Energy Supply System - Natural Gas - Piping Renewal | Urgent |
Exterior Windows - Sealant Replacement Renewal | Urgent |
Exterior Windows - Single Pane Aluminum Units Renewal | Urgent |
Heating Water Distribution Systems - Heating Piping System Renewal | Urgent |
Hot Water Boilers - Boiler #1 and Boiler #2 Renewal | Urgent |
Roof Coverings - Section A2,C Renewal | Urgent |
Site Civil/Mechanical Utilities Renewal | Urgent |
Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Structural Frame - Masonry Renewal | Urgent |
Air Handling Units - SF #1 Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
C1010 Partitions Renewal | High |
C101003 Partitions - Moveable - Foldable Partition (Classroom) - Lunchroom Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C302003 Floor Finishes - Wood -Cork Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Acoustic Ceiling Tiles - Original Building & Additions 1, 2 and 3 Renewal | High |
Controls and Instrumentation - BAS Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Electric DWH #2 Renewal | High |
Domestic Water Distribution - Natural Gas DWH #1 Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Domestic Water Distribution - Plumbing and Sump Pumps Renewal | High |
Exhaust Systems Renewal | High |
Exhaust Systems Renewal | High |
Exterior Doors - Exits - Hollow Metal and Wood Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Lighting - Pole Mounted Renewal | High |
Exterior Lighting - Wall Mounted Renewal | High |
Exterior Walls - Masonry Re-pointing Renewal | High |
Fencing & Gates - Chain link fence Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Metal Lockers - Original Building & Additions 1 and 2 Renewal | High |
Fittings - Millwork - Original Building & Addtions 1, 2 and 3 Renewal | High |
Floor Finishes - Carpet - Staff Room, Office and Music Room Renewal | High |
Interior Doors - Hardware - Original Building & Additions 1, 2 and 3 Renewal | High |
Interior Doors - Original Building & Additions 1, 2 and 3 - Wood and Hollow Metal Renewal | High |
Other Special Systems and Devices - Dust Collector Renewal | High |
Parking Lots - Asphalt Paved - Site Renewal | High |
Pedestrian Paving - Concrete and Asphalt Paved Renewal | High |
Playing Fields - Asphalt - Site - Paved Renewal | High |
Playing Fields - Soccer Field - Sodding, soccer posts - Unpaved Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Roof Top AHU - Cool - Office Renewal | High |
Sanitary Waste Renewal | High |
Domestic Water Distribution - Eyewash Stations Renewal | Medium |
Exit Lighting and Signs Renewal | Medium |
Exterior Soffits - & Front Canopy Renewal | Medium |
Playing Fields - Basketball courts - Paved Renewal | Medium |
Signage Renewal | Medium |
Structural Frame - Repairs Renewal | Medium |
Wall Finishes - Painted - Common areas Renewal | Medium |
Wall Finishes - Painted Renewal | Medium |
Controls & Instrumentation - EMS Renewal | Low |
Landscaping Renewal | Low |
Parking Lots - All curbs Renewal | Low |
Playing Fields - Paris Playscape - Unpaved Renewal | Low |
Roadways - Asphalt Renewal | Low |