Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
67.32 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - Expansion Tanks RenewalUrgent
Auxiliary Equipment - HVAC Pumps RenewalUrgent
Auxiliary Equipment - Stacks & Breaching RenewalUrgent
Hot Water Boilers - Boilers #1 and #2 RenewalUrgent
Roof Coverings - Learning centre- Section A6,A7,A8,A9 RenewalUrgent
Air Handling Units - SF #1, #2 and #3 RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Tectum tiles -1965 construction RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Domestic Water Distribution - Pipes and Fittings RenewalHigh
Electrical Service and Distribution - Panelboards RenewalHigh
Energy Supply System - Natural Gas RenewalHigh
Exhaust Systems - Centrifugal RenewalHigh
Exterior Doors - Hardware RenewalHigh
Exterior Doors RenewalHigh
Exterior Walls - 1965 construction & masonry chimney RenewalHigh
Exterior Walls - 1979 construction RenewalHigh
Exterior Windows - 50% - Single paned metal framed windows RenewalHigh
Fencing & Gates - Chain Link Fence RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Millwork - Classroom counters, cupboards & bookshelves RenewalHigh
Floor Finishes - Carpet RenewalHigh
Heating Water Distribution System - Pipes and Fittings RenewalHigh
Interior Doors - Classroom & Hallway Doors Hardware RenewalHigh
Interior Doors - Classroom & Hallway Doors RenewalHigh
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalHigh
Parking Lots - East parking lot RenewalHigh
Playing Fields - Paved RenewalHigh
Playing Fields - Two soccerfields & one baseball diamond - Unpaved RenewalHigh
Plumbing Fixtures - Washroom RenewalHigh
Roadways - Bus loop on the south east side of the property RenewalHigh
Signage - Wall mounted & illuminated sign RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalMedium
Ceiling Finishes - Suspended Tile RenewalMedium
Floor Finishes - Gym & stage hardwood floor RenewalMedium
Floor Finishes - Terrazzo - Hallways & washrooms RenewalMedium
Interior Stair Construction - Metal stairs RenewalMedium
Landscaping - South side of the property & courtyard RenewalMedium
Partitions - Learning Centre RenewalMedium
Pedestrian Paving RenewalMedium
Stormwater Management RenewalMedium
Wall Finishes - Painted walls in 1965 & 1979 constructions RenewalMedium
Ceiling Finishes - Wood panels in the gymnasium RenewalLow
Fittings - 1965 & 1979 constructions- Venetian blinds RenewalLow
Fittings - Rollup blinds RenewalLow
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density RenewalLow
Pedestrian Paving - One gate & one chain and post arrangement RenewalLow
Playing Fields - HILAN Playscape - Unpaved RenewalLow
Playing Fields - Paris Playscape - Unpaved RenewalLow
Rain Water Drainage RenewalLow
Sanitary Waste RenewalLow