Brief Description | Priority |
A101004 Standard Foundations Repairs - Damp proofing Repairs - New Renewal | Urgent |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Auxiliary Equipment - Condensate, Vacuum Return, Deaerator and Blowdown Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Stack & Breaching Renewal | Urgent |
Heating/Chilling Water Distribution Systems - Piping Renewal | Urgent |
Secondary - Transformers Renewal | Urgent |
Site Civil/Mechanical Utilities Renewal | Urgent |
Steam Boilers - Boiler #1 and #2 Renewal | Urgent |
?G204001 Wrought Iron & Chain Link Fencing Renewal | High |
Air Distribution, Heating & Cooling Renewal | High |
Air Handling Units - Cafeteria Supply Fan Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
Auxiliary Equipment - Heat Exchanger - Shell & Tube Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
B203008 Exterior Doors - Hardware Renewal | High |
Branch Wiring Renewal | High |
C102007 Interior Doors - Hardware Renewal | High |
C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
C103002 Fittings - Washroom Accessories Renewal | High |
C103009 Fittings - Millwork - Classrooms Renewal | High |
C103010 Fittings - Millwork - Laboratories Renewal | High |
C103017 Fittings - Auditorium Seating Renewal | High |
C302007 Floor Finishes - Painted Sealed Concrete Renewal | High |
Ceiling Finishes - Suspended 2x4 Panels Renewal | High |
Chilled Water Systems - Chiller Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - Rooftop Condensers - 1989 Renewal | High |
Distribution Systems - Axial Renewal | High |
Domestic Water Distribution - Eyewash Stations Renewal | High |
Domestic Water Distribution - Plumbing Piping System - Remaining Original Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Doors Renewal | High |
Exterior Windows - Original Renewal | High |
Floor Finishes - Carpet Flooring Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Interior Doors - Hollow Wood Renewal | High |
Interior Stair Construction Renewal | High |
Other Heat Generating Systems - RTU's - 1989 Renewal | High |
Other Special Systems and Devices - Dust Collector Renewal | High |
Pedestrian Paving - Asphalt, Concrete, & Interlocking - Paved Renewal | High |
Perimeter Heating - Terminal Units Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Plumbing Fixtures - Water Fountains Renewal | High |
Retaining Walls - Concrete Renewal | High |
Stormwater Management - Grading & Catch Basins Renewal | High |
Structural Frame - Concrete Canopy Frame Renewal | High |
Wall Finishes - Paint Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | Medium |
Ceiling Finishes - Plaster Ceilings Renewal | Medium |
Partitions - Localized Deficiencies Renewal | Medium |
Roof Coverings - Section D2,D4 Renewal | Medium |
Roof Coverings - Section C1,E,E1,F,F1 Renewal | Medium |
Domestic Water Distribution - DHW Plumbing Pumps Renewal | Low |
Domestic Water Distribution - Natural Gas DWH Renewal | Low |
Fencing & Gates - Site Improvements Renewal | Low |
Floor Finishes - Hardwood Renewal | Low |
Landscaping - Soft Renewal | Low |
Playing Fields - Unpaved Renewal | Low |
Signage - Wall Mounted & Metal Stand Renewal | Low |