Date Inspected | Location in School | Health & Safety Issue Observed | Class | Action Taken By | Date Action Taken | Details |
09/21/23 | Boiler Room. | receptacle/light switch (specify) | A | Caretaker | 11/01/23 | Details |
09/21/23 | hall | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 11/01/23 | Details |
09/21/23 | 319 | equipment damaged or improperly stored (specify) | B | Caretaker | 11/01/23 | Details |
10/15/23 | 326 | display(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls) | B | Caretaker | 11/01/23 | Details |
10/15/23 | 327 | display(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls) | B | Caretaker | 11/01/23 | Details |
10/15/23 | 211 prep | ceiling damaged (specify) | A | Caretaker | 11/01/23 | Details |
10/15/23 | Boiler Room... | leaking/pooling/ponding of water or liquid (be as specific as possible) | A | Caretaker | 11/01/23 | Details |
10/15/23 | 325 | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 11/01/23 | Details |
10/15/23 | 325 | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 11/01/23 | Details |
10/15/23 | 323 | display(s) not within TDSB standards as outlined by OH&S and Standards & Compliance (ie; artwork, hanging displays, paper on walls) | B | Caretaker | 11/01/23 | Details |
10/15/23 | 325 | ceiling damaged (specify) | A | Caretaker | 11/01/23 | Details |
11/15/23 | 225 | board in need of repair (black board, white board, cork board, etc.) | A | Caretaker | 12/02/23 | Details |
11/15/23 | 228 | microwave stickers missing | B | Caretaker | 12/02/23 | Details |
11/22/23 | 201 | trip hazard (i.e. flooring, other materials) | A | Caretaker | 12/02/23 | Details |
11/22/23 | 209 | ceiling tiles missing/loose | A | Caretaker | 12/02/23 | Details |
11/22/23 | electrical room basement | inappropriate storage of materials/furniture/shelving, or clutter | B | Caretaker | 12/02/23 | Details |
11/22/23 | 212 | lighting in need of repair (maintenance issue) | A | Caretaker | 12/02/23 | Details |
12/01/23 | 211 Chemical Storage Room | inspections not up to date (specify equipment) | B | Caretaker | 12/02/23 | Details |
12/01/23 | 125 | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 12/02/23 | Details |
12/01/23 | 129 | fire exit route sign (yellow TDSB) - not posted / requires updating | B | Caretaker | 12/02/23 | Details |
12/01/23 | 222 M. Staff Room | door/access door (specify) | A | Caretaker | 12/02/23 | Details |
12/01/23 | 301 | temperature does not meet TDSB Guideline | A | Caretaker | 12/02/23 | Details |
12/01/23 | 222 M. Staff Room | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 12/02/23 | Details |
12/01/23 | pool filter room | eyewash station required or in need of repair (specify) | A | Caretaker | 12/02/23 | Details |
12/01/23 | 301 | window damaged, in need of repair (specify) | A | Caretaker | 12/02/23 | Details |
01/24/24 | lower gymnasium | window covering recommended on 1st floor (emergency lockdown procedures) | B | Caretaker | 02/06/24 | Details |
01/24/24 | Boys Change Room | ceiling tiles missing/loose | A | Caretaker | 02/06/24 | Details |
01/24/24 | 125 | ceiling tiles missing/loose | A | Caretaker | 02/06/24 | Details |
01/24/24 | 127 | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 02/06/24 | Details |
01/24/24 | Prep Room 109 | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 02/06/24 | Details |
01/24/24 | science office room 9 | ceiling tiles missing/loose | A | Caretaker | 02/06/24 | Details |
01/24/24 | Prep Room 109 | ceiling tiles missing/loose | A | Caretaker | 02/06/24 | Details |
01/24/24 | 125 | egress blocked or insufficient path (doorway, hallway or stairwell) | B | Caretaker | 02/06/24 | Details |
01/24/24 | lower gymnasium | leaking/pooling/ponding of water or liquid (be as specific as possible) | A | Caretaker | 02/06/24 | Details |
02/05/24 | 226 | paint flaking, chipping, possible lead exposure | A | Caretaker | 02/06/24 | Details |
02/05/24 | 228 | microwave stickers missing | B | Caretaker | 02/06/24 | Details |
02/21/24 | Boiler Room. | eyewash station required or in need of repair (specify) | A | Caretaker | 04/29/24 | Details |
02/21/24 | Fan Room Basement | exposed wiring/damaged cord/ground pin missing | A | Caretaker | 04/29/24 | Details |
02/21/24 | Fan Room Basement | guarding or shielding not in place | A | Caretaker | 04/29/24 | Details |
03/05/24 | 211 Chemical Storage Room | ceiling damaged (specify) | A | Caretaker | 04/29/24 | Details |
03/05/24 | library | ceiling damaged (specify) | A | Caretaker | 04/29/24 | Details |
03/05/24 | science rm 9 | ceiling damaged (specify) | A | Caretaker | 04/29/24 | Details |
03/05/24 | fan room by boiler room | leaking/pooling/ponding of water or liquid (be as specific as possible) | A | Caretaker | 04/29/24 | Details |
03/05/24 | Science Office | inappropriate storage of materials/furniture/shelving, or clutter | B | Caretaker | 04/29/24 | Details |
03/05/24 | Science Office | ceiling damaged (specify) | A | Caretaker | 04/29/24 | Details |
04/19/24 | 109 | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 04/29/24 | Details |
04/19/24 | 114 | ceiling damaged (specify) | A | Caretaker | 04/29/24 | Details |
05/31/24 | lower gym | baseboard/radiator heater cover missing | A | Caretaker | 07/04/24 | Details |
05/31/24 | lower gym | trip hazard (i.e. flooring, other materials) | A | Caretaker | 07/04/24 | Details |
05/31/24 | lower gym | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Principal | 07/01/24 | Details |
05/31/24 | lower gym | leaking/pooling/ponding of water or liquid (be as specific as possible) | A | Caretaker | 07/04/24 | Details |
05/31/24 | lower gymnasium gallery | lighting in need of repair (maintenance issue) | A | Caretaker | 07/04/24 | Details |
05/31/24 | 211 Chemical Storage Room | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 07/04/24 | Details |
05/31/24 | 211 Chemical Storage Room | inspections not up to date (specify equipment) | B | Caretaker | 07/04/24 | Details |
05/31/24 | lower gym | equipment damaged or improperly stored (specify) | B | Principal | 07/01/24 | Details |
06/25/24 | Student council office | damaged surface (ie: wall, ceiling, flashing, drywall, flooring, stairs) | A | Caretaker | 07/04/24 | Details |
06/25/24 | fan room by boiler room | receptacle/light switch (specify) | A | Caretaker | 07/04/24 | Details |
06/25/24 | Boiler Room. | ceiling damaged (specify) | A | Caretaker | 07/04/24 | Details |
06/25/24 | Boiler Room. | leaking/pooling/ponding of water or liquid (be as specific as possible) | A | Caretaker | 07/04/24 | Details |
06/25/24 | Room 14 Hub A | evidence of pests (interior or exterior), be as specific as possible. | A | Caretaker | 07/04/24 | Details |
06/25/24 | 13 | unable to inspect (specify why if possible) | B | Caretaker | 07/04/24 | Details |
06/25/24 | 10 | ceiling tiles missing/loose | A | Caretaker | 07/04/24 | Details |
06/25/24 | 6 | ceiling tiles missing/loose | A | Caretaker | 07/04/24 | Details |
06/25/24 | 211 Chemical Storage Room | inspections not up to date (specify equipment) | B | Caretaker | 07/04/24 | Details |
06/25/24 | Boiler Room. | ACM - yellow asbestos bags present (attach a photo and include the number of bags)) | A1 | Caretaker | 07/04/24 | Details |