Brief Description | Priority |
A101004 Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
Auxiliary Equipment - Condensate and Vacuum Return Tanks Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps - Original Renewal | Urgent |
Electrical Service and Distribution - Panelboards Renewal | Urgent |
Heated Water Distribution System - Pipes and Fittings - Level 1 and 2 Renewal | Urgent |
Heated Water Distribution System - Pipes and Fittings - Level 3 and 4 Renewal | Urgent |
Roof Coverings - Section C2,C3,D Renewal | Urgent |
Roof Coverings - Section A,A1,B,B1,H,H1,H2 | Urgent |
Roof Coverings - Section C,C1,C4 Renewal | Urgent |
Roof Coverings - Section CF Renewal | Urgent |
Roof Coverings - Skylights Renewal | Urgent |
Air Handling Units - AHU #4 Thru #10 Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing - Localized Deficiencies Renewal | High |
B2020 Exterior Windows - Older Wood Renewal | High |
B203008 Exterior Doors - Hardware - Older Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103017 Fittings - Auditorium Seating Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Original Building Renewal | High |
Chilled Water Systems - SF Chiller - Music Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - DX Split - CU #1 and #2 Renewal | High |
Domestic Water Distribution - Other Supply - Swimming Pool & Systems Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Domestic Water Distribution - Water Treatment Systems Renewal | High |
Elevators and Lifts - Passenger - Hydraulic Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Doors - Original Building Renewal | High |
Exterior Windows - North Addition Renewal | High |
Fin Tube Radiation Units - Perimeter Heating - Level 1 and 2 Renewal | High |
Fin Tube Radiation Units - Perimeter Heating - Level 3 and 4 Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes- Sheet Floor Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Interior Stair Construction - Original Building Renewal | High |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Medium Density Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
Pedestrian Paving Renewal | High |
Playing Fields - Paved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Washroom Renewal | High |
Retaining Walls - Flag Stone Renewal | High |
Sanitary Waste Renewal | High |
Wall Finishes - Painted - Classrooms Renewal | High |
Wall Finishes - Painted - Common Areas Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C103009 Fittings - Millwork - Laboratories Renewal | Medium |
Fittings - Metal Lockers Renewal | Medium |
Fittings - Millwork Renewal | Medium |
Floor Finishes - Ceramic Tile Renewal | Medium |
Interior Doors Renewal | Medium |
Interior Doors hardware - Original Building Renewal | Medium |
Landscaping - North Edged Renewal | Medium |
Roof Coverings - Section F1 Renewal | Medium |
Wall Finishes - Ceramic Tile Renewal | Medium |
Distribution Systems - Air Distribution, Heating & Cooling - Duct System - Level 1 and 2 Renewal | Low |
Distribution Systems - Air Distribution, Heating & Cooling - Duct System - Level 3 and 4 Renewal | Low |
~D202033 Domestic Water Distribution - Pumps Renewal | Low |