Brief Description | Priority |
A101004 Standard Foundations Repairs - Damp proofing Repairs - Older Renewal | Urgent |
Auxiliary Equipment - Blowdown Tank Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Vacuum Return Renewal | Urgent |
B3010 Roof Coverings - Underground Parking Garage Renewal | Urgent |
Floor Finishes - Sheet Vinyl Floor Renewal | Urgent |
Heating Distribution Systems - Heating Piping Systems Renewal | Urgent |
Roof Coverings - Section B,B2 to B6,B8 to B10,BD4,E,E1,E2,F,FG!,G,G1,H,M,18 Renewal | Urgent |
Roof Coverings - Section B7,B8,C,J1,JK1,K,K1,K2,L,L2,I4 Renewal | Urgent |
Roof Coverings - Skylight Renewal | Urgent |
Site Civil Utilities - Underground Utilities Renewal | Urgent |
Steam Boilers - Boiler #1 Renewal | Urgent |
Steam Boilers - Boiler #2 Renewal | Urgent |
Steam Boilers - Boiler #3 Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Units (12 Units) Renewal | High |
Auxiliary Equipment - Chemical Feed System - Steam and Heating Renewal | High |
B101001 Structural Frame - Basement Pool Slab Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing - Older Renewal | High |
B203004 Exterior Doors - Overhead and Roll - up - Older Renewal | High |
Branch Wiring Renewal | High |
C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
C103002 Fittings - Washroom Accessories Renewal | High |
C103010 Fittings - Millwork - Laboratories Renewal | High |
Ceiling Finishes - Fixed Acoustic Tiles Renewal | High |
Ceiling Finishes - Lath & Plaster Renewal | High |
Ceiling Finishes - Painted Ceiling Structures Renewal | High |
Ceiling Finishes - Suspended Acoustic Panels Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - Condensers - 1971 Renewal | High |
Cooling Generating Systems - Condensers - 2000 Renewal | High |
Cooling Generating Systems - Condensers - 2006 Renewal | High |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Domestic Water Distribution - Sump Pumps Renewal | High |
Drinking Fountains and Coolers - Water Coolers Renewal | High |
Elevators and Lifts - Freight - Traction Renewal | High |
Exterior Doors - Entrance Doors Renewal | High |
Exterior Windows - East Windows Renewal | High |
Fencing & Gates - Chain Link Fence Renewal | High |
Fittings - Lockers - Original Building and Additions 1 - 9 Renewal | High |
Fittings - Millwork - Classrooms Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes - Hardwood Renewal | High |
Floor Finishes - Painted Concrete Renewal | High |
Floor Finishes - Vinyl Tiles Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs - Older Renewal | High |
Interior Doors - Hardware Renewal | High |
Interior Doors - Original Building and Additions 1 - 9 Renewal | High |
Interior Stair Construction - Steel Framed - Original Building and Additions 1 - 9 Renewal | High |
Other Special Systems and Devices - Dust Collector Renewal | High |
Parking Lots - Aboveground Asphalt Paved - Site Renewal | High |
Pedestrian Paving - Concrete - Site Renewal | High |
Pedestrian Paving - Concrete Pavers - Site Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Radiation Units - Perimeter Heating Renewal | High |
Retaining Walls - Stone Flower Beds - Site Renewal | High |
Sanitary Waste Renewal | High |
Signage - Site Renewal | High |
Structural Frame - Cracked Block Original Building Deteriorated Columns Exterior Bleachers Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painted - Original Building and Additions 1 - 9 Renewal | High |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Domestic Water Distribution - DWH #1 Renewal | Medium |
Exterior Doors - Hardware Renewal | Medium |
Floor Finishes - Ceramic Tile Renewal | Medium |
Floor Finishes - Terrazzo Renewal | Medium |
Partitions - Interior Partitions - Original Building and Additions 1 - 9 Renewal | Medium |
Wall Finishes - Ceramic Wall Tile Renewal | Medium |
Wall Finishes - Vinyl Wallcovering - Library Renewal | Medium |
Wall Finishes - Wall Acoustic Panels - Music and Drama Room Renewal | Medium |
Domestic Water Distribution - Eyewash Stations Renewal | Low |
Playing Fields - Football Field Renewal | Low |