Brief Description | Priority |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
Floor Finishes - Sheet Vinyl Floor - Older Renewal | Urgent |
Heated Water Distribution Systems Renewal | Urgent |
Site Civil/Mechanical Utilities Renewal | Urgent |
Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Wheelchair Stair Lift Renewal | Urgent |
Air Distribution, Heating & Cooling - Ductwork Renewal | High |
Air Handling Units - AHU #1 thru #8 Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | High |
C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | High |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | High |
C1030 - Fittings - Washroom - Renewal | High |
C103010 Fittings - Millwork - Laboratories - Renewal | High |
C103017 Fittings - Auditorium Seating Renewal | High |
C2020 Stair Finishes - Anti-skid tape Renewal | High |
C302001 Floor Finishes - Ceramic Renewal | High |
C303002 Ceiling Finishes - Plaster - Older Renewal | High |
Ceiling Finishes - Suspended Acoustic Panel Ceiling - 70% Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - Condensing Unit Renewal | High |
Cooling Generating Systems - Window AC Renewal | High |
Distribution Systems - Return Fans Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Domestic Water Distribution - Swimming Pool Pumps Renewal | High |
Exterior - Pole Renewal | High |
Exterior - Wall Mounted Renewal | High |
Exterior Doors - Hardware - Original Building & Addition 1 Renewal | High |
Exterior Doors - Hollow Metal - All Renewal | High |
Exterior Walls - Joint Sealant & Paint Renewal | High |
Fencing & Gates - Chain Link & Wrought Iron Fence Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Bleachers - Gymnasium Renewal | High |
Fittings - Metal Locker - Original Building & Addition 1 Renewal | High |
Fittings - Millwork - Original Building & Addition 1 Renewal | High |
Floor Finishes - Carpet - Older Renewal | High |
Floor Finishes - Hardwood - Gymnasium & Stage Renewal | High |
Floor Finishes - Vinyl Floor Tiles - Older Renewal | High |
Interior Doors - Hardware - Original Building & Addition 1 Renewal | High |
Interior Doors - Older Renewal | High |
Other Special Plumbing Systems - Filtration System Renewal | High |
Pedestrian Paving - Concrete and Asphalt Paved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Retaining Walls - Concrete and stone Renewal | High |
Sanitary Waste System Renewal | High |
Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Wall Finishes - Painted - Older Renewal | High |
C2010 Stair Construction - Metal framed and concrete framed Renewal | Medium |
Exterior Walls - Localized Deficiencies Renewal | Medium |
Hot Water Boilers - Pool Boiler Renewal | Medium |
Parking Lots - Asphalt - Site - Paved - West Lot Renewal | Medium |
Roadways - Asphalt - Site - Paved Renewal | Medium |
Stormwater Management Renewal | Medium |
Study [Structural Frame - Repairs/Pool etc.] | Medium |
Ceiling Finishes - Gypsum Board Ceiling Renewal | Low |
Controls & Instrumentation - EMS Renewal | Low |
Emergency Lighting and Power - Inverter Renewal | Low |
Fittings - All Renewal | Low |
Fittings - Window Coverings - All - Drapes and Venetian Blinds Renewal | Low |
Landscaping Renewal | Low |
Wall Finishes - Ceramic Tile Renewal | Low |