Toronto District School Board
Skip to main content

Forest Hill Junior and Senior Public School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
41.61 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Air Handling Units - Gym Supply RenewalUrgent
C302005 Floor Finishes - Carpet RenewalUrgent
D202001 Domestic Water Distribution - Pipes and Fittings RenewalUrgent
D2030 Sanitary Waste RenewalUrgent
D2040 Rain Water Drainage RenewalUrgent
D501003 Electrical Service and Distribution - Main Switchboard RenewalUrgent
D501005 Electrical Service and Distribution - Panel RenewalUrgent
D502004 Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalUrgent
Floor Finishes - Sheet Vinyl Floor - Classrooms RenewalUrgent
Floor Finishes - Vinyl Tiles RenewalUrgent
Interior Stair Construction RenewalUrgent
Other Cooling Generating Systems - A/C Cond Units RenewalUrgent
Other Heat Generating Systems - AHU HTG CAFE RenewalUrgent
Other Heat Generating Systems - AHU HTG FIELD RenewalUrgent
Roof Coverings - Section A,A1,E7 RenewalUrgent
Site Civil/Mechanical Utilities - Hydro RenewalUrgent
Standard Foundations - Waterproofing RenewalUrgent
B2020 Exterior Windows Older RenewalHigh
B2030 Exterior Doors - Hollow Metal RenewalHigh
B203008 Exterior Doors - Hardware RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C103017 Fittings - Auditorium Seating RenewalHigh
C2020 Stair Finishes - Anti-skid tape RenewalHigh
C301004 Wall Finishes - Ceramic RenewalHigh
C302007 Floor Finishes - Painted Sealed Concrete RenewalHigh
Ceiling Finishes - Acoustic Tile RenewalHigh
Ceiling Finishes - Painted RenewalHigh
D2010 Plumbing Fixtures - Bradley Basin RenewalHigh
D201001 Plumbing Fixtures - Water Closets RenewalHigh
D201003 Plumbing Fixtures - Lavatories RenewalHigh
D502001 Lighting and Branch Wiring - Branch Wiring RenewalHigh
D509097 Other Special Systems and Devices - Dust Collector RenewalHigh
Domestic Water Distribution - DHW Heater Junior School - John Wood RenewalHigh
Exhaust Systems - Exhaust Units RenewalHigh
Fencing & Gates - Exterior Stone & Concrete Stairs RenewalHigh
Fencing & Gates - Wrought Iron RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Ceramic Tile RenewalHigh
Floor Finishes - Hardwood RenewalHigh
Floor Finishes - Terrazzo - Localized Deficiencies RenewalHigh
G204002 Retaining Walls - Rail Ties RenewalHigh
G204010 Site Development - Exterior Stairs - Metal Exterior Stairs RenewalHigh
Interior Doors RenewalHigh
Interior Doors - Hardware RenewalHigh
Playing Fields - Asphalt Paved RenewalHigh
Playing Fields - Track RenewalHigh
Playing Fields - West Main Field - Unpaved RenewalHigh
Stormwater Management - Storm Sewers RenewalHigh
Wall Finishes - Paint RenewalHigh
C101003 Partitions - Moveable - Foldable Partition (Classroom) RenewalMedium
Partitions - Localized Deficiencies RenewalMedium
Pedestrian Paving - Concrete RenewalMedium