Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
139.42 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
A101004 Standard Foundations Repairs - Damp proofing Repairs RenewalUrgent
Auxiliary Equipment - Cushion, Condensate, Vacuum Return, Blowdown and Condensate Return Tanks RenewalUrgent
Auxiliary Equipment - HVAC Pumps RenewalUrgent
Auxiliary Equipment - Heat Exchangers - Shell & Tube RenewalUrgent
Auxiliary Equipment - Stacks & Breaching RenewalUrgent
Distribution Systems - Heated Water Distribution Systems - Piping System RenewalUrgent
Roof Coverings - Section A1-A8 RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Steam Boilers - Boiler #1 and #2 RenewalUrgent
A1030 Slab on Grade - Aged RenewalHigh
Air Distribution, Heating & Cooling - Duct System RenewalHigh
Air Handling Units - SF #1 and SF #2 RenewalHigh
Auxiliary Equipment - Chemical Feed System RenewalHigh
B101008 Floor Expansion Joints - Garage RenewalHigh
B201011 Exterior Walls - Joint Sealant RenewalHigh
B201014 Exterior Walls - Masonry Re-pointing RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C103009 Fittings - Millwork - Laboratories RenewalHigh
Ceiling Finishes - Acoustic Tile Ceiling - 1959 Building (Public School) RenewalHigh
Controls and Instrumentation - BAS RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Distribution Systems - Exhaust Systems - Centrifugal RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Hot Water Storage Tank RenewalHigh
Energy Supply System - Natural Gas RenewalHigh
Exterior Windows - Original Older RenewalHigh
Fencing & Gates - Chain Link Fence RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Millwork - 1959 Building (Public School) RenewalHigh
G204001 Fencing and Gates - Wrought Iron Fencing RenewalHigh
G204002 Retaining Walls - Stone RenewalHigh
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs RenewalHigh
Hot Water Boilers - Boiler #3 RenewalHigh
Lighting and Branch Wiring - Branch Wiring RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Plumbing Fixtures - Urinals RenewalHigh
Plumbing Fixtures - Water Closets RenewalHigh
Rain Water Drainage - Sump Pumps RenewalHigh
Sanitary Waste - Piping RenewalHigh
Structural Frame - Concrete Canopy Soffit RenewalHigh
Terminal and Package Units - Unit Ventilators RenewalHigh
Wall Finishes - Painted - 1959 Building (Public School) RenewalHigh
B203004 Exterior Doors - Overhead and Roll - up RenewalMedium
C1010 Partitions - Localized deficiencies RenewalMedium
C101003 Partitions - Moveable - Foldable Partition (GYM) RenewalMedium
C302004 Floor Finishes - Vinyl Tile RenewalMedium
Domestic Water Distribution - Pipes and Fittings RenewalMedium
Fittings - Lockers - 1959 Building (Public School) RenewalMedium
Interior Doors - Hardware - 1959 Building (Public School) RenewalMedium
Interior Doors - Main Building RenewalMedium
Domestic Water Distribution - DHWH #1 RenewalLow
Exterior Doors - Hardware - Newer RenewalLow
Exterior Doors - Newer RenewalLow
Stormwater Management RenewalLow