Runnymede Junior and Senior Public School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
66.61 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Electrical Service and Distribution - Panelboards RenewalUrgent
Roof Coverings - Section A,B,B4 RenewalUrgent
Roof Coverings - Section A1,AB1,B1 RenewalUrgent
Roof Coverings - Section B2,B3,C,D,D1 to D16,E to E3,F RenewalUrgent
Roof Coverings - skylights and coping RenewalUrgent
Air Handling Units - AHU and RF No. 2 and 3 RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C302004 Floor Finishes - Vinyl Tile - Older RenewalHigh
C303002 Ceiling Finishes - Plaster - Older RenewalHigh
Ceiling Finishes - Acoustic Tile Ceiling - Corridors & 70% Classrooms RenewalHigh
Ceiling Finishes - Suspended Acoustic Panel Ceiling - 30% Classrooms & Corridors RenewalHigh
Controls and Instrumentation - BAS RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Pipes and Fittings RenewalHigh
Exhaust Systems - Centrifugal RenewalHigh
Exterior Doors - Hardware RenewalHigh
Exterior Doors -Wood RenewalHigh
Exterior Walls - Columns RenewalHigh
Exterior Walls - Sealants RenewalHigh
Exterior Windows - Aluminum - North RenewalHigh
Fencing & Gates - Perimeter Fence etc. RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Lockers RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Hardwood - Classrooms RenewalHigh
Floor Finishes - Painted/Sealed Concrete Floor - Basement RenewalHigh
Floor Finishes - Sheet Vinyl Floor RenewalHigh
Interior Doors - Wood RenewalHigh
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density RenewalHigh
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalHigh
Parking Lots - Paved RenewalHigh
Pedestrian Paving - Asphalt RenewalHigh
Plumbing Fixtures - Bradley Basins RenewalHigh
Plumbing Fixtures - Lavatories RenewalHigh
Rain Water Drainage RenewalHigh
Roof Top AHU - Heat & Cool - RTU Library RenewalHigh
Sanitary Waste RenewalHigh
Steam Heating Distribution Systems - Piping System - 2nd and 3rd Floor RenewalHigh
Steam Heating Distribution Systems - Piping System - Boiler Room and First Floor RenewalHigh
Terminal and Package Units - Unit Ventilators RenewalHigh
Wall Finishes - Painted RenewalHigh
C101003 Partitions - Moveable - Foldable Partition (Classroom) RenewalMedium
C101003 Partitions - Moveable - Foldable Partition (GYM) RenewalMedium
Floor Finishes - Hardwood - Gymnasiums and Stage RenewalMedium
Interior Doors - Hardware RenewalMedium
Wall Finishes - Ceramic Tile - Washrooms, Showers, Classroom RenewalMedium
Air Distribution, Heating & Cooling - Ductwork RenewalLow
Ceiling Finishes - Gypsum Board Ceiling - Addition Corridor & Washrooms RenewalLow
Ceiling Finishes - Wood Ceiling - Stage RenewalLow
Cooling Generating Systems - DX Split RenewalLow
Domestic Water Distribution - Sump Pumps RenewalLow
Fittings - Chalkboards RenewalLow
Floor Finishes - Ceramic Tile - Showers RenewalLow
Playing Fields - Playscapes - Unpaved RenewalLow
Roadways - South side RenewalLow
Signage RenewalLow
Wall Finishes - Major Painting and Wall Upgrades [LEEP] RenewalLow