Brief Description | Priority |
Electrical Service and Distribution - Panelboards Renewal | Urgent |
Roof Coverings - Section A,B,B4 Renewal | Urgent |
Roof Coverings - Section A1,AB1,B1 Renewal | Urgent |
Roof Coverings - Section B2,B3,C,D,D1 to D16,E to E3,F Renewal | Urgent |
Roof Coverings - skylights and coping Renewal | Urgent |
Air Handling Units - AHU and RF No. 2 and 3 Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
C303002 Ceiling Finishes - Plaster - Older Renewal | High |
Ceiling Finishes - Acoustic Tile Ceiling - Corridors & 70% Classrooms Renewal | High |
Ceiling Finishes - Suspended Acoustic Panel Ceiling - 30% Classrooms & Corridors Renewal | High |
Controls and Instrumentation - BAS Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Doors -Wood Renewal | High |
Exterior Walls - Columns Renewal | High |
Exterior Walls - Sealants Renewal | High |
Exterior Windows - Aluminum - North Renewal | High |
Fencing & Gates - Perimeter Fence etc. Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Lockers Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Hardwood - Classrooms Renewal | High |
Floor Finishes - Painted/Sealed Concrete Floor - Basement Renewal | High |
Floor Finishes - Sheet Vinyl Floor Renewal | High |
Interior Doors - Wood Renewal | High |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
Parking Lots - Paved Renewal | High |
Pedestrian Paving - Asphalt Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Rain Water Drainage Renewal | High |
Roof Top AHU - Heat & Cool - RTU Library Renewal | High |
Sanitary Waste Renewal | High |
Steam Heating Distribution Systems - Piping System - 2nd and 3rd Floor Renewal | High |
Steam Heating Distribution Systems - Piping System - Boiler Room and First Floor Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painted Renewal | High |
C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Floor Finishes - Hardwood - Gymnasiums and Stage Renewal | Medium |
Interior Doors - Hardware Renewal | Medium |
Wall Finishes - Ceramic Tile - Washrooms, Showers, Classroom Renewal | Medium |
Air Distribution, Heating & Cooling - Ductwork Renewal | Low |
Ceiling Finishes - Gypsum Board Ceiling - Addition Corridor & Washrooms Renewal | Low |
Ceiling Finishes - Wood Ceiling - Stage Renewal | Low |
Cooling Generating Systems - DX Split Renewal | Low |
Domestic Water Distribution - Sump Pumps Renewal | Low |
Fittings - Chalkboards Renewal | Low |
Floor Finishes - Ceramic Tile - Showers Renewal | Low |
Playing Fields - Playscapes - Unpaved Renewal | Low |
Roadways - South side Renewal | Low |
Signage Renewal | Low |
Wall Finishes - Major Painting and Wall Upgrades [LEEP] Renewal | Low |