Brief Description | Priority |
Main Switchboards - Switchgear Unit #1 Renewal | Urgent |
Roof Coverings - Section C Renewal | Urgent |
Roof Coverings - Section C2,A1 Renewal | Urgent |
Auxiliary Equipment - Chemical Feed Systems Renewal | High |
Auxiliary Equipment - Expansion Tanks Renewal | High |
Auxiliary Equipment - Humidifiers Renewal | High |
Auxiliary Equipment- HVAC pumps Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201016 Exterior Walls - Precast Wall Panels - Localized Deficiencies Renewal | High |
Branch Wiring - 1970 Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C302002 Floor Finishes - Terrazzo - Epoxy Renewal | High |
Ceiling Finishes - Suspended Acoustic Panel Ceilings - 1968 Construction Renewal | High |
Controls and Instrumentation - Electronic/BAS Renewal | High |
Cooling Generating Systems - AC#1 and #2 Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Domestic Water Distribution - 1970 Renewal | High |
Domestic Water Distribution - DHWT #1 and #2 Renewal | High |
Exterior Doors - 1996 Addition Renewal | High |
Exterior Doors - Hardware - Original Building and Addition 1 Renewal | High |
Exterior Windows - Original Building Renewal | High |
Fencing & Gates - Chain-Link Fencing Renewal | High |
Fittings - Millwork - 1968 Construction Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes - Sheet Vinyl Floor Renewal | High |
Interior Doors - Hardware - Original Building and Addition 1 Renewal | High |
Playing Fields - Grass Surfaced Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Roof Top AHU - Heat & Cool - RTU #1, #2, #3 and #4 Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
B1030 Structural Columns and Beams - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | Medium |
Domestic Water Distribution - DHWT #3 Renewal | Medium |
Exterior Doors - Hardware - 1996 Addition Renewal | Medium |
Floor Finishes - Gymnasium Hardwood Floor Renewal | Medium |
Interior Doors - Metal and Wood Doors - 1968 Construction Renewal | Medium |
Interior Stair Construction - 1968 Construction Renewal | Medium |
Roadways - Asphalt Paved Roadway Renewal | Medium |
Domestic Water Distribution - DHWT #4 Renewal | Low |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | Low |
Exterior Doors - Automatic Device Renewal | Low |
Interior Doors - Hardware - 1996 Addition Renewal | Low |
Parking Lots - North and East lots Renewal | Low |
Pedestrian Paving - Swing gate Renewal | Low |
Signage - Boulevard Sign Renewal | Low |
Wall Finishes - 1996 Addition - Painted Walls Renewal | Low |
Wall Finishes - Painted - Original Building and Addition 1 Renewal | Low |
Wall Finishes - Painted Renewal | Low |