Brief Description | Priority |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Stacks and Breaching Renewal | Urgent |
Heating/Chilling water distribution systems Renewal | Urgent |
Hot Water Boilers - Boiler #1 Renewal | Urgent |
Hot Water Boilers - Boiler #2 Renewal | Urgent |
Hot Water Boilers - Boiler #3 Renewal | Urgent |
Other Special Systems and Devices Renewal | Urgent |
Roof Coverings - Section G2,I5 Renewal | Urgent |
Secondary - Substation Transformer Renewal | Urgent |
Secondary Switchboards Renewal | Urgent |
Secondary Transformers Renewal | Urgent |
Air Handling Units - Supply Fans Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
B203004 Exterior Doors - Overhead Renewal | High |
B203008 Exterior Doors - Hardware Renewal | High |
Branch Wiring Renewal | High |
C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
C103002 Fittings - Washroom Accessories Renewal | High |
C103005 Fittings - Lockers Renewal | High |
C103010 Fittings - Millwork - Laboratories Renewal | High |
C301012 Wall Finishes - Porcelain Renewal | High |
C302001 Floor Finishes - Ceramic Renewal | High |
C303002 Ceiling Finishes - Plaster & Sprayed Renewal | High |
Ceiling Finishes - Suspended Acoustic Panel Renewal | High |
Chilled Water Systems - Chiller Renewal | High |
Chilled Water Systems - Cooling Tower Renewal | High |
Cooling Generating Systems - Packaged Window AC Units Renewal | High |
Cooling Generating Systems - Rooftop Condensers Renewal | High |
Distribution Systems - Air Distribution, Heating & Cooling - Duct System Renewal | High |
Domestic Water Distribution - DHW Storage Tank Renewal | High |
Domestic Water Distribution - Plumbing Piping System Renewal | High |
Exhaust Systems - Original Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Walls - Localized Deficiencies Renewal | High |
Exterior Windows - All Elevations Renewal | High |
Fencing & Gates - Site Improvements Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Hardwood Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes - Terrazzo Renewal | High |
Floor Finishes - Vinyl Tile Renewal | High |
G202003 Parking Lots - Paved - Asphalt Paved Parking Area & Roadway Renewal | High |
G203003 Pedestrian Paving - Asphalt Paved Walkway Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
G204072 Playing Fields - Running Track Renewal | High |
Gas Supply System Renewal | High |
Lighting Equipment - Exterior Lighting Renewal | High |
Perimeter Heating - Terminal Units Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Plumbing Fixtures - Water Fountains Renewal | High |
Site Civil/Mechanical Utilities Renewal | High |
Stormwater Management Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painted Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
C102007 Interior Doors - Hardware Renewal | Medium |
C103017 Fittings - Auditorium Seating Renewal | Medium |
C303005 Ceiling Finishes - Wood Renewal | Medium |
Fire Protection Specialties - Irrigation & Kitchen Suppression Systems Renewal | Medium |
G204071 Playing Fields - Unpaved Renewal | Medium |
Interior Doors Renewal | Medium |
Other Fire Protection Systems - Backflow Preventer Renewal | Medium |
Controls & Instrumentation -BAS Renewal | Low |
Other Heat Generating Systems - Heat&Cool [1] - RTUs Renewal | Low |
Pedestrian Paving Renewal | Low |
Playing Fields - Paved Renewal | Low |