Brief Description | Priority |
Roof Coverings - Section A,A1,A3 Renewal | Urgent |
Site Civil/Mechanical Utilities Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Units - AHU #2, #3, #4 and #5 Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103009 Fittings - Millwork - Laboratories Renewal | High |
C302015 Floor Finishes - Vinyl Sheet Corridor Renewal | High |
C303006 Ceiling Finishes - Paint Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - CU - Keeprite Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | High |
Domestic Water Distribution - Water Storage Tank Renewal | High |
Exterior Door Hardware - Original Building Renewal | High |
Exterior Doors - Older Original Building Renewal | High |
Exterior Windows - Original 1975 & Greenhouse Renewal | High |
Fencing & Gates - Chain Link Fence Renewal | High |
Fencing & Gates - Timber Stair Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes - Hardwood Renewal | High |
Floor Finishes - Terrazzo Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Interior Doors - Hardware Renewal | High |
Interior Doors - Older Renewal | High |
Main Switchboards - Switchgear Renewal | High |
Make - Up AHU #4, #6, #7 and #10 Renewal | High |
Other Special Systems and Devices - Dust Collector Renewal | High |
Overhead and Roll-up Doors Renewal | High |
Parking Lots - Asphalt Renewal | High |
Pedestrian Paving - Asphalt & Concrete Renewal | High |
Plumbing Fixtures - Washrooms Renewal | High |
Roadways - Asphalt Renewal | High |
Roof Coverings - Section C Renewal | High |
Roof Coverings - Section C1,C2,C3,C4 Renewal | High |
Roof Coverings - Section D Renewal | High |
Sanitary Waste - Piping Renewal | High |
Secondary - Transformers Renewal | High |
Wall Finishes - Painted Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
C302004 Floor Finishes - Vinyl Tile Renewal | Medium |
Ceiling Finishes - Suspended Acoustic Panel Ceiling Renewal | Medium |
Domestic Water Distribution - Pipes and Fittings Renewal | Medium |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Renewal | Medium |
Stormwater Management Renewal | Medium |
Cooling Generating Systems - CU - Carrier Renewal | Low |
Cooling Generating Systems - CU - Eng Air Renewal | Low |
Cooling Generating Systems - DX Split - Cafe and Staff Dining Renewal | Low |
Domestic Water Distribution - DHW Pumps Renewal | Low |
Roof Top AHU - Heat & Cool - HVAC #1 Renewal | Low |