Brief Description | Priority |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Secondary Transformer Renewal | Urgent |
Air Handling Units - SF #1 to #15 Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
C1030 - Fittings - Washroom - Metal Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Acoustic Ceiling Tiles & Suspended Ceiling Tiles Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - CU #1 Renewal | High |
Cooling Generating Systems - CU #4 Renewal | High |
Cooling Generating Systems - Kitchen - Retherm Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Electrical Service and Distribution - Panelboards Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Doors Renewal | High |
Exterior Windows - Hollow Metal Pool Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fire Protection Specialties - Kitchen Suppression Renewal | High |
G204010 Site Development - Exterior Stairs - Exterior Stairs Renewal | High |
Heating Water Distribution Systems - HW Piping - Level 1 Renewal | High |
Heating Water Distribution Systems - HW Piping - Level 2 Renewal | High |
Interior Doors - Hardware Renewal | High |
Interior Doors - Wood & Hollow Metal Renewal | High |
Interior Stair Construction Renewal | High |
Interior Stair Construction to the pool mechanical room Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
Lighting and Branch Wiring - Stage Lighting- Auditorium and Drama Renewal | High |
Pedestrian Paving - Localized Deficiencies Renewal | High |
Playing Fields - Unpaved Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Roof Coverings - Skylights Renewal | High |
Site Civil/Mechanical Utilities Renewal | High |
Wall Finishes - Painted Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
C103009 Fittings - Millwork - Laboratories Renewal | Medium |
Ceiling Finishes Renewal | Medium |
Domestic Water Distribution - Pipes and Fittings Renewal | Medium |
Fittings - Lockers Renewal | Medium |
Fittings - Millwork Renewal | Medium |
Floor Finishes - Hardwood Renewal | Medium |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Medium Density Renewal | Medium |
Pedestrian Paving - Asphalt, Concrete & Interlocking Renewal | Medium |
Stormwater Management Renewal | Medium |
Air Distribution, Heating & Cooling - Duct System - Level 1 Renewal | Low |
Air Distribution, Heating & Cooling - Duct System - Level 2 Renewal | Low |
Fencing & Gates - Chain Link Fence Renewal | Low |
Fittings - Drapes & Blinds Renewal | Low |
Landscaping Renewal | Low |
Other Special Systems and Devices - Dust Collector Renewal | Low |
Pedestrian Paving Renewal | Low |
Rain Water Drainage Renewal | Low |
Roof Top AHU - Heat & Cool - RTU #1, #3 and "C" Renewal | Low |
Sanitary Waste Renewal | Low |
Signage Renewal | Low |
Wood Shop Make - Up AHU MUA-1 Renewal | Low |