Brief Description | Priority |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
Exit Stair Older Renewal | Urgent |
Hot Water Boilers - Boilers #1 and #2 Renewal | Urgent |
Roof Coverings - Section A,D2 Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Units - (Six AHU) Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
B302006 Roof Openings - Skylights Domed Acrylic Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103009 Fittings - Millwork - Laboratories Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Acoustic Tile Renewal | High |
Ceiling Finishes - Painted Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Sump Pumps Renewal | High |
Electrical Service and Distribution - Panelboards Renewal | High |
Energy Supply System - Natural Gas Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Doors - Metal Renewal | High |
Exterior Walls - Localized Deficiencies Renewal | High |
Exterior Windows - Single Glazed - Corridors, Stairwells, 2/F & 3/F North Facade Renewal | High |
Fencing & Gates - East & South Perimeter Fence Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Hardwood - Gym, Art Room & Stage Renewal | High |
Floor Finishes - Terrazzo Renewal | High |
G204002 Retaining Walls - Cast in Place Renewal | High |
Heated Water Distribution Systems - Pipes and Fittings Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
Main Switchboards - Switchgear Renewal | High |
Playing Fields - Building Perimeter Asphalt Pavement Renewal | High |
Playing Fields - Sod - Unpaved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Sanitary Waste Renewal | High |
Site Development - Concrete Exterior Stairs Renewal | High |
C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Domestic Water Distribution - Pipes and Fittings Renewal | Medium |
Fittings- Lockers Renewal | Medium |
Interior Doors - Hardware Renewal | Medium |
Interior Doors - Wood Renewal | Medium |
Interior Stair Construction - Addition 1 Renewal | Medium |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density Renewal | Medium |
Parking Lots - Asphalt Renewal | Medium |
Pedestrian Paving Renewal | Medium |
Wall Finishes - Paint Renewal | Medium |
Wall Finishes - Tile Renewal | Medium |
Ceiling Finishes - Suspended Acoustic Panel Ceiling - Addition 1 Renewal | Low |
Ceiling Finishes - Suspended Acoustic Panel Ceiling - Library & Home Ed Rm Renewal | Low |
Domestic Water Distribution - DHWH #1 Renewal | Low |
Fittings - Horizontal Blinds & Drapes Renewal | Low |
Floor Finishes - Vinyl Tile - 9" x 9" Renewal | Low |
Landscaping Renewal | Low |
Playing Fields - Basketball Hoops - Paved Renewal | Low |
Roadways - Asphalt Driveways Renewal | Low |
Stormwater Management Renewal | Low |
Wall Finishes - Paint - Hallway and Office Renewal | Low |