Brief Description | Priority |
A101004 Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
Auxiliary Equipment - Stacks and Breaching Renewal | Urgent |
B302006 Roof Openings - Skyligts Domed Acrylic Renewal | Urgent |
Hot Water Boilers - Boiler #1 & #2 Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
Branch Wiring Renewal | High |
C103009 Fittings - Millwork - Laboratories - Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Suspended Ceiling Panels Renewal | High |
Cooling Generating Systems - Condensing Unit #1 Renewal | High |
Distribution Systems - Air Distribution, Heating & Cooling - Duct System Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Water Storage Tank Renewal | High |
Energy Supply System - Natural Gas Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Doors - Older Renewal | High |
Exterior Windows - Older Renewal | High |
Fencing & Gates - Chain Link Fence Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Millwork - 1958 Construction Renewal | High |
Floor Finishes - Painted/Sealed Concrete Floor Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Interior Doors Renewal | High |
Interior Doors Renewal | High |
Interior Stair Construction Renewal | High |
Lighting Equipment - Exterior - Pole Renewal | High |
Lighting Equipment - Exterior - Wall Renewal | High |
Pedestrian Paving - Asphalt & Concrete Renewal | High |
Playing Fields - Asphalt Paved - Sloped Renewal | High |
Playing Fields - Asphalt Paved Renewal | High |
Playing Fields - Grass Surfaced - Regrading - Unpaved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Retaining Walls - Stone Renewal | High |
Retaining Walls - Wood Renewal | High |
Roadways - Asphalt Paved Renewal | High |
Sanitary Waste - Piping Renewal | High |
Site Civil/Mechanical Utilities Renewal | High |
Wall Finishes - Painted Renewal | High |
B308020 Exterior Soffits Renewal | Medium |
C1010 Partitions - Localized deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
C1030 - Fittings - Washroom Renewal | Medium |
Domestic Water Distribution - Pipes and Fittings Renewal | Medium |
Floor Finishes - Hardwood - Gym Renewal | Medium |
Floor Finishes - Terrazzo - Localized deficiencies Renewal | Medium |
Heat Generating - Domestic Hot Water Boiler Renewal | Medium |
Wall Finishes - Ceramic Tiles Renewal | Medium |
Other Special Systems and Devices - Dust Collector Renewal | Low |
Stormwater Management Renewal | Low |