Toronto District School Board
Skip to main content

Etobicoke Secondary Alternative School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
78.51 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Auxiliary Equipment - HVAC Pumps RenewalUrgent
Auxiliary Equipment - Stacks & Breaching RenewalUrgent
Electrical Service and Distribution - Main Switchgear RenewalUrgent
Electrical Service and Distribution - Panelboards RenewalUrgent
Elevators and Lifts - Stair Lift RenewalUrgent
Heating Water Distribution Systems - Heating Piping RenewalUrgent
Hot Water Boiler RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Auxiliary Equipment - Chemical Feed System RenewalHigh
B2020 Exterior Windows - Older RenewalHigh
C302004 Floor Finishes - Vinyl Tile - Older RenewalHigh
Ceiling Finishes - Original Building RenewalHigh
Controls and Instrumentation - BAS RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Cooling Generating Systems - DX Split RenewalHigh
Distribution Systems - Exhaust - Centrifugal RenewalHigh
Domestic Water Distribution - Drinking Fountains and Coolers RenewalHigh
Domestic Water Distribution - Pipes and Fittings RenewalHigh
Domestic Water Distribution - Sump Pump RenewalHigh
Energy Supply System - Natural Gas - Piping RenewalHigh
Exterior Doors - Original Building RenewalHigh
Fencing & Gates - Original Building RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Floor Finishes - Carpet RenewalHigh
Floor Finishes - Hardwood RenewalHigh
Interior Doors - Hardware RenewalHigh
Interior Doors - Original Building RenewalHigh
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Low Density RenewalHigh
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalHigh
Lighting and Branch Wiring - Interior Lighting RenewalHigh
Parking Lots - Original Building RenewalHigh
Plumbing Fixtures - Washroom RenewalHigh
Rain Water Drainage RenewalHigh
Sanitary Waste RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalMedium
C1030 - Fittings - Washroom - Older RenewalMedium
Domestic Water Distribution - DHWH #2 RenewalMedium
Domestic Water Distribution - DHWH #3 RenewalMedium
Exterior Doors - Hardware RenewalMedium
Fittings - Millwork RenewalMedium
Interior Stair Construction - Original Building RenewalMedium
Stormwater Management RenewalMedium
Wall Finishes - Painted RenewalMedium
C103018 Fittings - Window Coverings RenewalLow
Floor Finishes - Vinyl tiles - Newer RenewalLow