Brief Description | Priority |
Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps - Original Renewal | Urgent |
Heating/Chilling Water Distribution Systems - Piping Renewal | Urgent |
Roof Coverings - Section A7,A8,A11,B3,E,E3,E6 Renewal | Urgent |
Site Civil/Mechanical Utilities Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
B201015 Exterior Walls - Metal Siding Renewal | High |
B203008 Exterior Doors - Hardware Renewal | High |
Branch Wiring Renewal | High |
C102007 Interior Doors - Hardware Renewal | High |
C103001 Fittings - Washroom Partitions - Water Closet - New Renewal | High |
C103002 Fittings - Washroom Accessories Renewal | High |
C103010 Fittings - Millwork - Laboratories Renewal | High |
C103016 Fittings - Bleachers Renewal | High |
C103017 Fittings - Auditorium Seating Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Suspended Acoustic Panels Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - Condensers Renewal | High |
Domestic Water Distribution - Plumbing Piping System Renewal | High |
Domestic Water Distribution - Sump Pumps Renewal | High |
Elevators and Lifts - Freight Renewal | High |
Exhaust Systems - Axial Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Doors - All - Hollow Metal, Wood and Alluminum Renewal | High |
Exterior Windows - All Renewal | High |
Fin Tube Radiation Units - Terminal Heating Units Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Hardwood - Stage & Shops Renewal | High |
Floor Finishes - Terrazzo Renewal | High |
G201003 Roadways - Paved - Asphalt Paved Roadway Renewal | High |
G202003 Parking Lots - Paved - Asphalt Paved Parking Area Renewal | High |
Interior Doors - Stained Wood and Glazed Metal Renewal | High |
Lighting Equipment - Exterior Lighting Renewal | High |
Other Heat Generating Systems - RTUs - Courtyard Renewal | High |
Other Heat Generating Systems - RTUs Renewal | High |
Pedestrian Paving - Aged - Asphalt Paved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Plumbing Fixtures - Water Coolers Renewal | High |
Signage - Wall Mounted Renewal | High |
Stormwater Management Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
C1010 Partitions - Localized Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
C103005 Fittings - Lockers Renewal | Medium |
Domestic Water Distribution - Electric Hot Water Heater Renewal | Medium |
Fire Protection Specialties - Kitchen Suppression (2) Renewal | Medium |
Landscaping Renewal | Medium |
Domestic Water Distribution - Natural Gas DWH Renewal | Low |
Fencing & Gates - Bleachers Renewal | Low |
Fittings - Drapes Renewal | Low |
Lockers - Major Painting Renewal | Low |
Playing Fields - Sod Renewal | Low |
Playing Fields - Track - Unpaved Renewal | Low |
Sanitary Waste Renewal | Low |