Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
45.91 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
A101004 Standard Foundations Repairs - Parging repairs - Localized Deficiencies RenewalUrgent
Exterior Walls - Localized Deficiencies RenewalUrgent
Floor Finishes - Carpet RenewalUrgent
Air Handling Units - AHU HTG S-12 & S-9 RenewalHigh
Air Handling Units - AHU HTG CLG SF 11 Shop RenewalHigh
Air Handling Units - AHU HTG CLG SF1 GYM RenewalHigh
Air Handling Units - AHU HTG CLG SF2 CAF RenewalHigh
Air Handling Units - AHU HTG S7 RenewalHigh
Air Handling Units - Classroom Unit -1 - AHU CLG SF10 RenewalHigh
Air Handling Units - Classroom Unit -2 - AHU CLG RenewalHigh
Air Handling Units - Original Building - AHU HTG SF-3 ADMIN RenewalHigh
Air Handling Units - Original Building - AHU HTG SF-5 AUD RenewalHigh
Auxiliary Equipment - Circulation Pumps RenewalHigh
B201011 Exterior Walls - Joint Sealant - Older RenewalHigh
B2030 Exterior Doors - Hollow Metal - Older RenewalHigh
B203004 Exterior Doors - Overhead and Roll - up - Older RenewalHigh
B203008 Exterior Doors - Hardware - Older RenewalHigh
C103009 Fittings - Millwork - Laboratories RenewalHigh
C302004 Floor Finishes - Vinyl Tile RenewalHigh
Ceiling Finishes - Acoustic Tile RenewalHigh
Ceiling Finishes - Paint RenewalHigh
Controls & Instrumentation - BAS System RenewalHigh
D101012 Elevators and Lifts - Passenger - Hydraulic RenewalHigh
D302050 Auxiliary Equipment - Chemical Feed System RenewalHigh
D304008 Air Handling Units RenewalHigh
D305004 Fin Tube Radiation Units RenewalHigh
D501005 Electrical Service and Distribution - Panel RenewalHigh
Exterior Windows - Original Windows RenewalHigh
Fittings - Lockers RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Terrazzo RenewalHigh
G204072 Playing Fields - Gravel Running Track RenewalHigh
Hot Water Boilers - Heating Boiler -3 RenewalHigh
Parking Lots - Paved RenewalHigh
Playing Fields - Asphalt RenewalHigh
Playing Fields - Soccer/Football Field RenewalHigh
Roadways - Paved RenewalHigh
Roof Coverings - Section B,BC1,BC2,CD1 RenewalHigh
Signage RenewalHigh
Wall Finishes - Paint RenewalHigh
C101003 Partitions - Moveable - Foldable Partition (Classroom) RenewalMedium
C101003 Partitions - Moveable - Foldable Partition (GYM) RenewalMedium
C1020 Interior Doors - Hollow Metal / Wood Single Door RenewalMedium
C1030 - Fittings - Washroom RenewalMedium
C103017 Fittings - Auditorium Seating RenewalMedium
D2010 Plumbing Fixtures - Bradley Basin RenewalMedium
D201001 Plumbing Fixtures - Water Closets RenewalMedium
D201003 Plumbing Fixtures - Lavatories RenewalMedium
D201006 Domestic Water Distribution - Drinking Fountains and Coolers RenewalMedium
D202001 Domestic Water Distribution - Pipes and Fittings RenewalMedium
D304007 Distribution Systems - Exhaust Systems RenewalMedium
D502001 Lighting and Branch Wiring - Branch Wiring RenewalMedium
Interior Doors - Hardware RenewalMedium
Stormwater Management RenewalMedium