Brief Description | Priority |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
B302006 Roof Openings - Skylight Renewal | Urgent |
D302051 Auxiliary Equipment - Expansion Tanks - 1986 Renewal | Urgent |
D302053 Auxiliary Equipment - Humidifiers Renewal | Urgent |
Elevators and Lifts - Wheelchair Lift Renewal | Urgent |
Main Switchboards - Secondary Switchgear Renewal | Urgent |
Roof Coverings - Section B1,B2,B4,C1,C3,C4,D2,F6A Renewal | Urgent |
Roof Coverings - Section DF1 Renewal | Urgent |
Secondary Renewal | Urgent |
Site Civil/Mechanical Utilities - Sanitary - 1959 Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Units - Auditorium Renewal | High |
Air Handling Units - Cafe Renewal | High |
Air Handling Units - Corridor #5 Renewal | High |
Air Handling Units - Gym Renewal | High |
Air Handling Units - Kitchen Renewal | High |
B2020 Exterior Windows - 1959 Entrance Renewal | High |
C103001 Fittings - Washroom Partitions - Water Closet - Older Renewal | High |
C103002 Fittings - Washroom Accessories Renewal | High |
C103010 Fittings - Millwork - Laboratories Renewal | High |
C301005 Wall Finishes - Paint Renewal | High |
Ceiling Finishes - Suspended Ceiling Tiles Renewal | High |
Chilled Water Systems - Cooling Tower Renewal | High |
D2010 - Plumbing Fixtures - Water Fountains - Original Renewal | High |
D201001 Plumbing Fixtures - Water Closets - Original Renewal | High |
D201002 Plumbing Fixtures - Urinals - Original Renewal | High |
D201003 Plumbing Fixtures - Lavatories - Original Renewal | High |
D2030 Sanitary Waste - Original Renewal | High |
D2040 Rain Water Drainage - Original Renewal | High |
D302050 Auxiliary Equipment - Chemical Feed System - 1986 Renewal | High |
D305004 Fin Tube Radiation Units - New Renewal | High |
D502004 Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | High |
D509097 Other Special Systems and Devices - Dust Collector Renewal | High |
Domestic Water Distribution - Plumbing Piping Systems (approx. 40%) - Pre-1980 Construction Renewal | High |
Elevators and Lifts - Passenger - Hydraulic Renewal | High |
Exhaust Systems Renewal | High |
Exterior Doors - Hollow Metal Renewal | High |
Exterior Walls - Deficiencies Renewal | High |
Exterior Windows - 1985 Addition Renewal | High |
Fencing & Gates - Chain Link Fencing Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes - Ceramic Tiles Renewal | High |
Floor Finishes - Hardwood - Double Gyms, Stage & Rm 128 Renewal | High |
Floor Finishes - Painted/Sealed Concrete Floor - Basement, 75% Auditorium, 25% Rm 128 Renewal | High |
G201003 Roadways - Paved - Reconstruct Asphalt Paved Roadway Renewal | High |
G203003 Pedestrian Paving - Asphalt Paved Walkway Renewal | High |
G204001 Fencing and Gates - Chain Link Fence - Tennis Court Renewal | High |
G204005 Signage - Wall Mounted Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
G204072 Playing Fields - Asphalt Tennis Court Renewal | High |
Heating and Chilled water distribution systems - Heating & Chilled Piping Systems - Original Renewal | High |
Lighting Equipment - Exterior - HID Wall Pack Fixtures Renewal | High |
Plumbing Fixtures - Eye Wash Stations Renewal | High |
Site Civil/Mechanical Utilities - 1988 Renewal | High |
Site Development - Fencing - Wrought Iron Renewal | High |
Wall Finishes - Acoustic Wall Treatment Renewal | High |
B203008 Exterior Doors - Hardware Renewal | Medium |
Branch Wiring - 1959 -1975 Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (Classroom) Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
C102007 Interior Doors - Hardware Renewal | Medium |
C103005 Fittings - Lockers Renewal | Medium |
C103009 Fittings - Millwork - Classrooms - Older Renewal | Medium |
C103017 Fittings - Auditorium Seating Renewal | Medium |
Ceiling Finishes - Painted Gypsum Board - SW Vestibule, Change Rooms, Washrooms, 20% Library Renewal | Medium |
D2010 Plumbing Fixtures - Bradley Basins Renewal | Medium |
D301002 Energy Supply System - Natural Gas Renewal | Medium |
Domestic Water Distribution - DHW Heaters - Room 243C Renewal | Medium |
Domestic Water Distribution - Room 257C Renewal | Medium |
Electrical Service and Distribution - Panel (600, 220, 120 V) - 1959 to 1975 Renewal | Medium |
Floor Finishes - Terrazzo - Halls, Washrooms, Landings, Entrances Renewal | Medium |
Floor Finishes - Vinyl Tiles Renewal | Medium |
G202003 Parking Lots - Paved - Resurface Asphalt Paved Parking Area Renewal | Medium |
G204071 Playing Fields - Unpaved Renewal | Medium |
G204072 Playing Fields - Asphalt Running Track Renewal | Medium |
Interior Doors - Hollow Metal & Wood Renewal | Medium |
Roof Coverings - Section A,A1,A2 Renewal | Medium |
Wall Finishes - Auditorium & Outside Halls - Wood Panels Renewal | Medium |
Wall Finishes - Ceramic Tile Renewal | Medium |
Air Handling Units - 1st Floor B Renewal | Low |
Air Handling Units - 1st Floor Renewal | Low |
Air Handling Units - 2nd Floor B Renewal | Low |
Air Handling Units - 2nd Floor Renewal | Low |
C103001 Fittings - Washroom Partitions - Water Closet - Newer Renewal | Low |
Ceiling Finishes - Painted Lath & Plaster - Auditorium, Adjacent Upper and Lower Halls, Auditorium Vestibule Renewal | Low |
Fittings - Auditorium Curtains Renewal | Low |
Fittings - Window Covering - Blinds and Drapes Renewal | Low |
Landscaping Renewal | Low |