Brief Description | Priority |
B302006 Roof Openings - Skyligts Domed Acrylic Renewal | Urgent |
Distribution Systems - Heated Water Distribution Systems - Piping System Renewal | Urgent |
Interior Stair Construction - Older Renewal | Urgent |
Roof Coverings - A1,A2,E,F2,F3,H1 Renewal | Urgent |
Roof Coverings - Section E3,F1,G Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System Renewal | High |
Air Handling Units - SF #1 Thru #12 Renewal | High |
B101001 Structural Frame - Concrete Canopies Renewal | High |
B101001 Structural Frame - Gymnasium Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
Branch Wiring Renewal | High |
C103009 Fittings - Millwork - Laboratories - Older Renewal | High |
C302002 Floor Finishes - Terrazzo - Localized deficiencies Renewal | High |
Ceiling Finishes - Paint Renewal | High |
Ceiling Finishes - Suspended Acoustic Panel Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Exhaust Systems - Axial Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Doors - All - Hollow Metal and Solid Wood Older Renewal | High |
Exterior Doors - Hardware Renewal | High |
Fencing & Gates - Chain Link Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Hardwood Renewal | High |
Floor Finishes - Painted/Sealed Concrete Floor Renewal | High |
Floor Finishes - Vinyl Tile - Older Renewal | High |
G204001 Fencing and Gates - Wrought Iron Fencing - Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs - Renewal | High |
G204072 Playing Fields - Asphalt Running Track Renewal | High |
Interior Doors - Aged - Hollow Metal and Wood Renewal | High |
Interior Doors - Hardware Renewal | High |
Lighting Equipment - Exterior - Wall Renewal | High |
Parking Lots - Asphalt Renewal | High |
Pedestrian Paving - Asphalt Renewal | High |
Pedestrian Paving - Front Entrance - Concrete Paved Renewal | High |
Playing Fields - Sports Field - Unpaved - Grass Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Sanitary Waste - Piping Renewal | High |
Site Civil/Mechanical Utilities - All Renewal | High |
Terminal & Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painted Renewal | High |
C1010 Partitions - Localized deficiencies Renewal | Medium |
C1030 - Fittings - Washroom Renewal | Medium |
Domestic Water Distribution - Pipes and Fittings Renewal | Medium |
Partitions - 1924, 29 & 30 Construction - Plaster & Painted Concrete Block Renewal | Medium |
Roof Coverings - Section H,L,L1,L2,M,M1,M2,N,N1 Renewal | Medium |
Controls and Instrumentation - BAS Renewal | Low |
Domestic Water Distribution - Natural Gas DWH Renewal | Low |
Fencing & Gates - Concrete - Stairs and Ramp Renewal | Low |
Floor Finishes - Vinyl Tile - Newer Renewal | Low |
Retaining Walls - Timber Renewal | Low |