Glenview Senior Public School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
47.15 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
A101004 Standard Foundations Repairs - Damp proofing Repairs - Water Infiltration on North Wall of Pipe Tunnel RenewalUrgent
Auxiliary Equipment - Expansion Tank RenewalUrgent
Interior Stair Construction - Original Building RenewalUrgent
Air Handling Units - AHU HTG Class RenewalHigh
Air Handling Units - AHU HTG Gym RenewalHigh
B201014 Exterior Walls - Masonry Re-pointing - Localized Deficiencies RenewalHigh
C103009 Fittings - Millwork - Laboratories RenewalHigh
Ceiling Finishes - Paint RenewalHigh
Controls & Instrumentation - Complete System - BAS RenewalHigh
D302054 Auxiliary Equipment - HVAC Pumps RenewalHigh
D304007 Distribution Systems - Exhaust Systems RenewalHigh
D502004 Lighting and Branch Wiring - Exterior Lighting - Wall Mounted RenewalHigh
Domestic Water Distribution - Hot Water Storage Tank RenewalHigh
Elevators & Lifts - WCA RenewalHigh
Exterior Doors - Exit Doors RenewalHigh
Exterior Doors - Hardware RenewalHigh
Fencing & Gates - Painted Steel Fencing RenewalHigh
Fencing & Gates - Perimeter & Parking Area Chain Link Fence RenewalHigh
Fittings - Lockers RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Vinyl Tile - 20% of Classrooms - 12" x 12" RenewalHigh
G204072 Playing Fields - Asphalt School Playground - Localized Deficiencies RenewalHigh
Hot Water Boilers - Oakwood Boiler -1 RenewalHigh
Hot Water Boilers - Oakwood Boiler -2 RenewalHigh
Main Switchboards RenewalHigh
Parking Lots - Asphalt RenewalHigh
Pedestrian Paving - Asphalt Paved Pedestrian Walkway RenewalHigh
Roadways - Asphalt RenewalHigh
Stair Finishes RenewalHigh
Structural Frame - Localized Deficiencies RenewalHigh
Terminal & Package Units - Perimeter Radiators & Force Flow Heaters RenewalHigh
Wall Finishes - Paint RenewalHigh
C101003 Partitions - Moveable - Foldable Partition (GYM) RenewalMedium
C101003 Partitions - Moveable - Foldable Partition Library RenewalMedium
C1030 - Fittings - Washroom RenewalMedium
Ceiling Finishes - Suspended Acoustic Tile RenewalMedium
D2010 Plumbing Fixtures - Bradley Basin - Shops RenewalMedium
D202001 Domestic Water Distribution - Pipes and Fittings RenewalMedium
D502001 Lighting and Branch Wiring - Branch Wiring RenewalMedium
Floor Finishes - Hardwood - Gymnasium and Stage RenewalMedium
Interior Doors RenewalMedium
Stormwater Management - Drainage System RenewalMedium