Brief Description | Priority |
A101004 Standard Foundations Repairs - Damp proofing Repairs Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Heat Exchanger - Shell & Tube Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
G40 Site Electrical Utilities - Feeders Renewal | Urgent |
Heating/Chilling water distribution systems - 1912 and 1957 Heating Piping Renewal | Urgent |
Interior Stair Construction - Steel Framed Stairs Renewal | Urgent |
?G204001 Wrought Iron Fencing Renewal | High |
Air Handling Units - Air Handling Units Renewal | High |
Auxiliary Equipment - Chemical Feed System Renewal | High |
B203008 Exterior Doors - Hardware Renewal | High |
Branch Wiring - 1912 and 1957 Construction Renewal | High |
C102007 Interior Doors - Hardware Renewal | High |
C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
C103002 Fittings - Washroom Accessories Renewal | High |
C103005 Fittings - Lockers Renewal | High |
C103010 Fittings - Millwork - Laboratories Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Painted Ceiling Renewal | High |
Ceiling Finishes - Suspended Acoustic Panel Ceiling Renewal | High |
Controls & Instrumentation - BAS Panel and Heating Controls Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Domestic Water Distribution - All Building - Plumbing Piping System Renewal | High |
Domestic Water Distribution - DHW Storage Renewal | High |
Exhaust Systems - Centrifugal Exhaust Fans Renewal | High |
Exterior Walls - Original Building Renewal | High |
Fittings - Millwork - Counters, Shelves and Cabinetry Renewal | High |
Floor Finishes - Carpet Remaining Areas Renewal | High |
Floor Finishes - Finished Concrete Flooring in Basement Renewal | High |
Floor Finishes - Hardwood Finish - Gym and Classrooms (50%) Renewal | High |
Floor Finishes - Seamless - Washrooms (50%) Renewal | High |
Floor Finishes - Terrazzo - Corridors and Washrooms (50%) Renewal | High |
G202003 Parking Lots & Roadway - Paved - Asphalt Renewal | High |
G204001 Fencing and Gates - Chain Link Fence Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs - New Renewal | High |
G204010 Site Development - Exterior Stairs - Metal Exterior Stairs - New Renewal | High |
Interior Doors Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | High |
Perimeter Heating - Terminal Units Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Water Coolers Renewal | High |
Retaining Walls Renewal | High |
Site Civil/Mechanical Utilities Renewal | High |
Stormwater Management Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painted - Aged Renewal | High |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Domestic Water Distribution - DHW Heater Renewal | Medium |
Domestic Water Distribution - Circulation and Sump Pumps Renewal | Low |
Fittings - Aged Window Coverings - Blinds and Drapes Renewal | Low |
Fittings - Chalkboards Renewal | Low |
Partitions - 1912 Construction - Painted Plaster and Brick Partitions Renewal | Low |
Playing Fields - Balance Beam - Unpaved Renewal | Low |
Playing Fields - Henderson Playscape - Unpaved Renewal | Low |
Playing Fields - Slide - Unpaved Renewal | Low |
Retaining Walls - Original Building Renewal | Low |