Brief Description | Priority |
A101004 Standard Foundations Repairs - Damp proofing Repair Renewal | Urgent |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Auxiliary Equipment - Condensate, Blow Down and Vacuum Return Tanks Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps Renewal | Urgent |
Auxiliary Equipment - Heat Exchanger - Plate - Glycol Preheat Renewal | Urgent |
Auxiliary Equipment - Heat Exchanger - Shell & Tube - DHW Renewal | Urgent |
Auxiliary Equipment - Stacks & Breaching Renewal | Urgent |
Distribution Systems - Hydronic/Steam Distribution Systems - Piping System Renewal | Urgent |
Interior Stair Construction - Original Building Renewal | Urgent |
Main Switchboards - Switchgear Renewal | Urgent |
Site Civil/Mechanical Utilities Renewal | Urgent |
Steam Boilers - Boiler #1 and #2 Renewal | Urgent |
Air Distribution, Heating & Cooling - Duct System - SF #3 and #4 Renewal | High |
Air Handling Units - SF #3 and SF #4 Renewal | High |
Auxiliary Equipment - Chemical Feed Systems Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
Branch Wiring Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103009 Fittings - Millwork - Laboratories Renewal | High |
C302001 Floor Finishes - Ceramic Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
Ceiling Finishes - Acoustic Tile Ceiling Renewal | High |
Controls and Instrumentation - BAS Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Hot Water Storage Tank Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Domestic Water Distribution - Sumps & DHW Circulating Pumps Renewal | High |
Exterior Doors - Hardware - Older Renewal | High |
Exterior Doors - Older Renewal | High |
Fencing & Gates - Chain Link Fence Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Lockers Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes -Terrazzo Renewal | High |
G204002 Retaining Walls - Stone Renewal | High |
Gypsum Wallboard Ceiling Finishes Renewal | High |
Interior Doors - Hardware - Original Building & Additions Renewal | High |
Interior Doors - Original Building & Additions Renewal | High |
Interior Stair Construction - Addition Renewal | High |
Lighting Equipment - Exterior - Wall Renewal | High |
Parking Lots - North Asphalt Pavement Renewal | High |
Pedestrian Paving Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Roadways Renewal | High |
Sanitary Waste - Piping Renewal | High |
Second Floor Washroom Renewal | High |
Signage Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
C1010 Partitions - Localized deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
Stormwater Management Renewal | Medium |
Floor Finishes - Carpet - Part of Office & Library Renewal | Low |