Brief Description | Priority |
A101004 Standard Foundations Repairs - Parging repairs Renewal | Urgent |
Air Distribution, Heating & Cooling - 1972 Renewal | Urgent |
D101004 Elevators and Lifts - Wheelchair Lift Renewal | Urgent |
Heating/Chilling Water Distribution Systems - 1972 Renewal | Urgent |
Roof Coverings - Section B,B4,E,C Renewal | Urgent |
Auxiliary Equipment - Boiler Chemical Feed System Renewal | High |
Auxiliary Equipment - HVAC Pumps Renewal | High |
B203004 Exterior Doors - Overhead Renewal | High |
B203008 Exterior Doors - Hardware Renewal | High |
Branch Wiring - 1972 Renewal | High |
C102007 Interior Doors - Hardware Renewal | High |
C103001 Fittings - Washroom Partitions - Water Closet Renewal | High |
C103002 Fittings - Washroom Accessories Renewal | High |
C103009 Fittings - Millwork - Classrooms Renewal | High |
C302004 Floor Finishes - Vinyl Tile Renewal | High |
C303004 Ceiling Finishes - Acoustic Renewal | High |
Chilled Water Systems - Rooftop Condensing Units - 1990 Renewal | High |
D2010 Plumbing Fixtures - Bradley Basin - 1972 Renewal | High |
D201001 Plumbing Fixtures - Water Closets - New Renewal | High |
D201003 Plumbing Fixtures - Lavatories - 1972 Renewal | High |
D202030 Domestic Water Distribution - Natural Gas DWH - 1998 Renewal | High |
D302051 Auxiliary Equipment - Expansion Tanks Renewal | High |
D304007 Distribution Systems - Exhaust Systems - Axial Renewal | High |
D305004 Fin Tube Radiation Units - 1972 Renewal | High |
D306003 Controls and Instrumentation - Pneumatic Renewal | High |
Exterior Doors - Hollow Metal Renewal | High |
Exterior Walls - 1972 Construction Renewal | High |
Exterior Walls - EIFS Deterioration Renewal | High |
Floor Finishes - Carpet Renewal | High |
G201003 Roadways - Paved - Resurface Asphalt Paved Roadway Renewal | High |
G202003 Parking Lots - Paved - Resurface Asphalt Paved Parking Area Renewal | High |
G204001 Fencing and Gates - Chain Link Fence Renewal | High |
G204072 Playing Fields - Asphalt School Playground Renewal | High |
Interior Doors - 1972 and 1998 Renewal | High |
Interior Stair Construction - 1972 Building Renewal | High |
Stormwater Management Renewal | High |
Wall Finishes - Painted - Classrooms Renewal | High |
D2010 - Plumbing Fixtures - Water Coolers - 1998 Renewal | Medium |
D302052 Auxiliary Equipment - Heat Exchanger - Plate Renewal | Medium |
Domestic Water Distribution - Piping - 1972 Renewal | Medium |
Electrical Service and Distribution - Panel (600, 220, 120 V) - 1972 Renewal | Medium |
Exterior Walls - Sealant Replacement Renewal | Medium |
Floor Finishes - 1998 Gym - Hardwood Renewal | Medium |
G204071 Playing Fields - Soccer Field/Football/Baseball Diamond Renewal | Medium |
Partitions - Localized Deficiencies Renewal | Medium |
Roof Coverings - Section D to D3 Renewal | Medium |
Chilled Water Systems - Rooftop Condensing Units - 1998 Renewal | Low |
D201002 Plumbing Fixtures - Urinals - 1998 Renewal | Low |
Exterior Doors - Automatic Door Devices Renewal | Low |
Fencing & Gates - Chain Link Fence Renewal | Low |
Fencing & Gates - Steel Control Gate Renewal | Low |
Fittings - Window Coverings - Pull down shades Renewal | Low |
Landscaping Renewal | Low |
Pedestrian Paving - Concrete and Asphalt Renewal | Low |
Playing Fields - Unpaved - Playscapes Renewal | Low |
Rain Water Drainage - 1972 Renewal | Low |
Sanitary Waste - 1972 Renewal | Low |