Sir William Osler High School

Facility Condition Index

2022 -2023

The Facility Condition Index (FCI) rating is a measurement of the condition of a school building. It does not reflect on the safety of the building.

The health and safety of students, staff and community members are our top priority when planning school repairs. Our Facility Services staff works year-round to ensure our schools are safe regardless of their FCI rating.

Almost half of TDSB school buildings were built more than 60 years ago. Older schools often have a higher FCI rating as some building components such as walls, lights, floors and ventilation systems may require major repairs or replacement.


F.C.I.
74.60 %

Learn More

Learn more about the Renewal Needs Backlog and the Facility Condition Index, both of which include related Frequently Asked Questions.

Renewal Needs Backlog

The Toronto District School Board’s Renewal Needs Backlog (RNB) list identifies approximately 20,400 different repairs needed in our schools. The total value of those repairs was $4.2 billion as of March 2023.

For the 2022-2023 school year, the TDSB  received $292 million in provincial funding. These funds will be used to replace/repair building components identified during the Ministry’s school inspections, helping reduce the FCI of school buildings.

It is important to understand that these repairs do not represent a health or safety concern. Safety is a top priority for us at the TDSB and our maintenance plans are always focused on providing safe places for our students and staff. In order to do that, we fix the most critical problems related to health and safety first. Also, while components in a school building may be past their life expectancy (e.g. water boiler), they are in good condition and meet all required safety codes.

Legend

Urgent Building systems that are in critical condition and have surpassed their useful service life. These systems are very important to the operation of the building (e.g. boilers, other heat generating systems, fire alarm, sprinkler system, standpipe system, public address system, roofing, etc.). Although there is no specific timeframe to repair/replace these systems, it is recommended to do it as soon as funding becomes available.
High Building systems that are in critical or poor condition and their importance to the operation of the building is less than those classified as “urgent” (e.g. brick work, exterior doors, exterior windows, rooftop units, etc.). There is no specific timeframe to repair/replace these systems; however, repair/replacement is recommended as soon as funding becomes available.
Medium Building systems that are in fair condition with low importance to the operation of the building (e.g. floor finishes, washroom partitions, millwork, etc.).
Low Building systems that are in fair or good condition with very low importance to the operation of the building (e.g. wall partitions, interior wall finishes, interior doors, fences, etc.).
Brief DescriptionPriority
Roof Coverings - Section A,A1,A3 RenewalUrgent
Site Civil/Mechanical Utilities RenewalUrgent
Air Distribution, Heating & Cooling - Duct System RenewalHigh
Air Handling Units - AHU #2, #3, #4 and #5 RenewalHigh
Auxiliary Equipment - Chemical Feed System RenewalHigh
B201014 Exterior Walls - Masonry Re-pointing RenewalHigh
C1030 - Fittings - Washroom RenewalHigh
C103009 Fittings - Millwork - Laboratories RenewalHigh
C302015 Floor Finishes - Vinyl Sheet Corridor RenewalHigh
C303006 Ceiling Finishes - Paint RenewalHigh
Controls and Instrumentation - Pneumatic RenewalHigh
Cooling Generating Systems - CU - Keeprite RenewalHigh
Distribution Systems - Exhaust Systems - Axial RenewalHigh
Distribution Systems - Exhaust Systems - Centrifugal RenewalHigh
Distribution Systems - Heated Water Distribution Systems - Piping System RenewalHigh
Domestic Water Distribution - Water Storage Tank RenewalHigh
Exterior Door Hardware - Original Building RenewalHigh
Exterior Doors - Older Original Building RenewalHigh
Exterior Windows - Original 1975 & Greenhouse RenewalHigh
Fencing & Gates - Chain Link Fence RenewalHigh
Fencing & Gates - Timber Stair RenewalHigh
Fin Tube Radiation Units - Perimeter Heating RenewalHigh
Fittings - Millwork RenewalHigh
Floor Finishes - Carpet RenewalHigh
Floor Finishes - Hardwood RenewalHigh
Floor Finishes - Terrazzo RenewalHigh
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs RenewalHigh
Interior Doors - Hardware RenewalHigh
Interior Doors - Older RenewalHigh
Main Switchboards - Switchgear RenewalHigh
Make - Up AHU #4, #6, #7 and #10 RenewalHigh
Other Special Systems and Devices - Dust Collector RenewalHigh
Overhead and Roll-up Doors RenewalHigh
Parking Lots - Asphalt RenewalHigh
Pedestrian Paving - Asphalt & Concrete RenewalHigh
Plumbing Fixtures - Washrooms RenewalHigh
Roadways - Asphalt RenewalHigh
Roof Coverings - Section C RenewalHigh
Roof Coverings - Section C1,C2,C3,C4 RenewalHigh
Roof Coverings - Section D RenewalHigh
Sanitary Waste - Piping RenewalHigh
Secondary - Transformers RenewalHigh
Wall Finishes - Painted RenewalHigh
C1010 Partitions - Localized Deficiencies RenewalMedium
C101003 Partitions - Moveable - Foldable Partition (GYM) RenewalMedium
C302004 Floor Finishes - Vinyl Tile RenewalMedium
Ceiling Finishes - Suspended Acoustic Panel Ceiling RenewalMedium
Domestic Water Distribution - Pipes and Fittings RenewalMedium
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts RenewalMedium
Stormwater Management RenewalMedium
Cooling Generating Systems - CU - Carrier RenewalLow
Cooling Generating Systems - CU - Eng Air RenewalLow
Cooling Generating Systems - DX Split - Cafe and Staff Dining RenewalLow
Domestic Water Distribution - DHW Pumps RenewalLow
Roof Top AHU - Heat & Cool - HVAC #1 RenewalLow