Brief Description | Priority |
C2010 Stair Construction - Metal framed and concrete framed - Older Renewal | Urgent |
G204002 Retaining Walls - Cast in Place Renewal | Urgent |
Air Distribution, Heating & Cooling - Ductwork Renewal | High |
Air Handling Units - Supply Fans Renewal | High |
Auxiliary Equipment - Heat Exchanger - Plate - DHW Renewal | High |
Auxiliary Equipment - Stacks & Breaching - 1969 Renewal | High |
B203004 Exterior Doors - Overhead and Roll - up - Older Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103009 Fittings - Millwork - Laboratories Renewal | High |
C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
Ceiling Finishes - Painted Structure Renewal | High |
Chilled Water Systems - Air-Cooled Hermetic Chiller Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - CU #1 Renewal | High |
Cooling Generating Systems - Window AC Renewal | High |
Distribution Systems - Exhaust Systems - Axial Renewal | High |
Distribution Systems - Exhaust Systems - Centrifugal Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Electrical Service and Distribution - Motor Control Centres Renewal | High |
Electrical Service and Distribution - Panels Renewal | High |
Electrical Service and Distribution - Secondary Transformers Renewal | High |
Energy Supply System - Natural Gas - Piping Renewal | High |
Exterior Doors - All Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Windows - Aluminum sunshades Renewal | High |
Exterior Windows - Older Renewal | High |
Fencing & Gates - Chain Link Fence Renewal | High |
Fencing & Gates - Others Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Carpet Renewal | High |
Floor Finishes - Ceramic Tile Renewal | High |
Floor Finishes - Hardwood Renewal | High |
G204010 Site Development - Exterior Stairs - Concrete Exterior Stairs Renewal | High |
Heated Water Distribution Systems - Heating Piping - 1st Floor Renewal | High |
Heated Water Distribution Systems - Heating Piping - 2nd Floor Renewal | High |
Interior Doors - All Renewal | High |
Interior Doors - Hardware Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Pole Mounted Renewal | High |
Lighting and Branch Wiring - Exterior Lighting - Wall Mounted Renewal | High |
Other HVAC Systems and Equipment - Refrigeration Systems - Freezer Renewal | High |
Other HVAC Systems and Equipment - Refrigeration Systems - Walk in Cooler Renewal | High |
Parking Lots - All Renewal | High |
Playing Fields - Resodding - Unpaved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Urinals Renewal | High |
Roadways - Asphalt Renewal | High |
Sanitary Waste - Piping Renewal | High |
Signage Renewal | High |
Standard Foundations - Repairs Renewal | High |
Structural Frame - Repairs Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Painted Renewal | High |
Auxiliary Equipment - Variable Frequency Drives (VFD) Renewal | Medium |
C1010 Partitions - Localized Deficiencies Renewal | Medium |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
C103017 Fittings - Auditorium Seating Renewal | Medium |
Ceiling Finishes - Acoustic ceiling tiles Renewal | Medium |
Domestic Water Distribution - DHW Storage Tanks Renewal | Medium |
Domestic Water Distribution - DHW and Pool Sump Pumps Renewal | Medium |
Domestic Water Distribution - Natural Gas DWH - Kitchen Renewal | Medium |
Domestic Water Distribution - Pipes and Fittings Renewal | Medium |
Elevators and Lifts - Passenger - Hydraulic Renewal | Medium |
Fittings - Lockers Renewal | Medium |
Ladders & Steps Renewal | Medium |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Medium Density Renewal | Medium |
Other Special Systems and Devices - Shop Compressed Air Systems Renewal | Medium |
Pedestrian Paving Renewal | Medium |
Plumbing Fixtures - Water Closets Renewal | Medium |
Site Civil/Mechanical Utilities Renewal | Medium |
Stair Finishes Renewal | Medium |
Wall Finishes - Ceramic Wall Tile - Washrooms/Change Rooms Renewal | Medium |
Cooling Generating Systems - CU #2 and #3 Renewal | Low |
Fittings - Window Coverings Renewal | Low |
Landscaping Renewal | Low |
Other Special Systems and Devices - Dust Collector Renewal | Low |
Rain Water Drainage Renewal | Low |
Stormwater Management Renewal | Low |
Terminal and Package Units - Unit Ventilators - 2008 Renewal | Low |
Wall Finishes - LEEP [GPL3-09-094] - Painted Renewal | Low |