Brief Description | Priority |
A101004 Standard Foundations Repairs - Parging repairs - Localized Deficiencies Renewal | Urgent |
Auxiliary Equipment - Expansion Tanks Renewal | Urgent |
Auxiliary Equipment - HVAC Pumps - Aged Renewal | Urgent |
Auxiliary Equipment - Humidifiers Renewal | Urgent |
Electrical Service and Distribution - Panelboards Renewal | Urgent |
Floor Finishes - Carpet Remainder Renewal | Urgent |
Roof Coverings - Section A2 Renewal | Urgent |
Roof Coverings - Section E Renewal | Urgent |
Roof Openings - Skylights Domed Acrylic Renewal | Urgent |
Air Distribution, Heating & Cooling - Ductwork - 1st Floor Renewal | High |
Air Distribution, Heating & Cooling - Ductwork - 2nd Floor Renewal | High |
Air Handling Units - AHU #2 to #13 Renewal | High |
Auxiliary Equipment - Heat Exchanger - Plate Renewal | High |
B201011 Exterior Walls - Joint Sealant Renewal | High |
B201014 Exterior Walls - Masonry Re-pointing Renewal | High |
B203004 Exterior Doors - Overhead and Roll - up - Older Renewal | High |
C1030 - Fittings - Washroom Renewal | High |
C103009 Fittings - Millwork - Laboratories - Older Renewal | High |
C302002 Floor Finishes - Terrazzo - Localized Deficiencies Renewal | High |
C302004 Floor Finishes - Vinyl Tile - Older Renewal | High |
C303002 Ceiling Finishes - Plaster - Double Gym Renewal | High |
Ceiling Finishes - Acoustic Ceiling Tiles Renewal | High |
Chilled Water Distribution Systems - Piping System Renewal | High |
Controls and Instrumentation - Pneumatic Renewal | High |
Cooling Generating Systems - CU #3 and #4 Renewal | High |
Cooling Generating Systems - Window AC Renewal | High |
Domestic Water Distribution - DHW Water Storage Tank - Pool Renewal | High |
Domestic Water Distribution - Drinking Fountains and Coolers Renewal | High |
Domestic Water Distribution - Pipes and Fittings Renewal | High |
Elevators and Lifts - WCA Renewal | High |
Energy Supply System - Natural Gas Renewal | High |
Exhaust Systems - Axial Renewal | High |
Exhaust Systems - Centrifugal Renewal | High |
Exterior Doors - Hardware Renewal | High |
Exterior Doors Renewal | High |
Fencing & Gates - Fencing Renewal | High |
Fin Tube Radiation Units - Perimeter Heating Renewal | High |
Fittings - Lockers Renewal | High |
Fittings - Millwork Renewal | High |
Floor Finishes - Ceramic Renewal | High |
Floor Finishes - Gym Renewal | High |
Heated Water Distribution Systems - Pipes and Fittings - 1st Floor Renewal | High |
Heated Water Distribution Systems - Pipes and Fittings - 2nd Floor Renewal | High |
Interior Doors - Wood Renewal | High |
Interior Doors - Hardware Renewal | High |
Lighting and Branch Wiring - Stage Lighting Renewal | High |
Other HVAC Systems and Equipment - Refrigeration Systems - Freezer/Cooler Renewal | High |
Other Heat Generating Systems - HRV #1 and #2 Renewal | High |
Pedestrian Paving Renewal | High |
Playing Fields - Paved Renewal | High |
Plumbing Fixtures - Bradley Basins Renewal | High |
Plumbing Fixtures - Lavatories Renewal | High |
Plumbing Fixtures - Water Closets Renewal | High |
Roof Coverings - Section B7 Renewal | High |
Sanitary Waste Renewal | High |
Stair Finishes Renewal | High |
Terminal and Package Units - Unit Ventilators Renewal | High |
Wall Finishes - Paint Renewal | High |
C101003 Partitions - Moveable - Foldable Partition (GYM) Renewal | Medium |
G204071 Playing Fields - Soccer Field/Football/Baseball Diamond Renewal | Medium |
Landscaping Renewal | Medium |
Lighting and Branch Wiring - Branch Wiring - Cabling, Raceways & Bus Ducts Medium Density Renewal | Medium |
Stormwater Management Renewal | Medium |